| Author | Title | Date | 
| ASCE | Monitoring Dam Performance: Instrumentation and Measurements | 2018 | 
| DHS | The Risk Management Process: An Interagency Security Committee Standard | 2024 | 
| DHS | Facility Security Plan: An Interagency Security Committee Guide | 2015 | 
| FEMA | Federal Guidelines for Dam Safety (FEMA P-93) | 2023 | 
| FEMA | Model State Dam Safety Program (FEMA P-316) | 2022 | 
| FEMA | Dam Safety Warning Signs Best Practices (FEMA P-2188) | 2021 | 
| FEMA | Emergency Operations Planning: Dam Incident Planning Guide (FEMA P-508) | 2019 | 
| FEMA | Pocket Safety Guide for Dams and Impoundments (FEMA P-911) | 2016 | 
| FEMA | Evaluation and Monitoring of Seepage  and  Internal Erosion (FEMA P-1032) | 2015 | 
| FEMA | Federal Guidelines for Dam Safety Risk Management (FEMA P-1025) | 2015 | 
| FEMA | Technical Manual: Overtopping Protection for Dams (FEMA P-1015) | 2014 | 
| FEMA | Emergency Action Planning for Dams (FEMA P-64) | 2013 | 
| FEMA | Federal Guidelines for Inundation Mapping of Flood Risks Associated with Dam Incidents and Failures (FEMA P-946) | 2013 | 
| FEMA | Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94) | 2013 | 
| FEMA | Filters for Embankment Dams | 2011 | 
| FEMA | Technical Manual: Outlet Works Energy Dissipators (FEMA P-679) | 2010 | 
| FEMA | Geotextiles in Embankment Dams (FEMA P-730) | 2008 | 
| FEMA | Emergency Action Planning for State Regulated High-Hazard Potential Dams (FEMA P-608) | 2007 | 
| FEMA | Technical Manual: Plastic Pipe Used in Embankment Dams (FEMA P-675) | 2007 | 
| FEMA | Federal Guidelines for Dam Safety: Earthquake Analyses and Design of Dams (FEMA P-65) | 2005 | 
| FEMA | Technical Manual: Conduits through Embankment Dams (FEMA P-484) | 2005 | 
| FEMA | Technical Manual for Dam Owners: Impacts of Animals on Earthen Dams (FEMA P-473) | 2005 | 
| FEMA | Technical Manual for Dam Owners: Impacts of Plants on Earthen Dams (FEMA P-534) | 2005 | 
| FEMA | Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) | 2004 | 
| FEMA | Federal Guidelines for Dam Safety: Glossary of Terms (FEMA P-148) | 2004 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 15- Supporting Technical Information Document | 2021 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 11- Arch Dams | 2018 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 12- Water Conveyance | 2018 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 13- Evaluation of Earthquake Ground Motions | 2018 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 14- Dam Safety Performance Monitoring Program | 2017 | 
| FERC | Risk-Informed Decision Making (RIDM) Interim Policy Guidance | 2016 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 3- Gravity Dams | 2016 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 1- General Requirements | 2015 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams | 2015 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 6- Emergency Action Plans | 2015 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 9- Instrumentation and Monitoring | 2015 | 
| FERC | Security Plan Template | 2010 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 4- Embankment Dams | 2004 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood | 2001 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 10- Other Dams | 1997 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 7- Construction Quality Control Inspection Program | 1993 | 
| FERC | Guidelines for Public Safety at Hydropower Projects | 1992 | 
| FERC | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 5- Geotechnical Investigations and Studies | 1991 | 
| ICMM | Tailings Management: Good Practice Guide | 2021 | 
| ICMM | Global Industry Standard on Tailings Management | 2020 | 
| NRCS | National Engineering Handbook: Chapter 5 - Streamflow Data | 2020 | 
| NRCS | National Engineering Handbook: Chapter 4 - Storm Rainfall Depth and Distribution | 2019 | 
| NRCS | National Engineering Handbook: Chapter 21 - Design Hydrographs | 2019 | 
| NRCS | Technical Release 210-60: Earth Dams and Reservoirs | 2019 | 
| NRCS | National Engineering Handbook: Chapter 26 - Gradation Design of Sand and Gravel Filters | 2017 | 
| NRCS | National Engineering Handbook: Chapter 6 - Stream Reaches and Hydrologic Units | 2015 | 
| NRCS | National Engineering Handbook: Chapter 50 - Earth Spillway Design | 2014 | 
| NRCS | National Engineering Handbook: Chapter 51 - Earth Spillway Erosion Model | 2014 | 
| NRCS | National Engineering Handbook: Chapter 17 - Flood Routing | 2014 | 
| NRCS | National Engineering Handbook: Chapter 2 - Engineering Geologic Investigations | 2012 | 
| NRCS | National Engineering Handbook: Chapter 3 - Engineering Classification of Earth Materials | 2012 | 
| NRCS | National Engineering Handbook: Chapter 4 - Engineering Classification of Rock Materials | 2012 | 
| NRCS | National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing | 2012 | 
| NRCS | National Engineering Handbook: Chapter 14 - Stage Discharge Relations | 2012 | 
| NRCS | National Engineering Handbook: Chapter 30 - Groundwater Hydrology and Geology | 2010 | 
| NRCS | National Engineering Handbook: Chapter 15 - Time of Concentration | 2010 | 
| NRCS | National Engineering Handbook: Chapter 7 - Hydrologic Soil Groups | 2009 | 
| NRCS | National Engineering Handbook: Chapter 45 - Filter Diaphragms | 2007 | 
| NRCS | National Engineering Handbook: Chapter 16 - Hydrographs | 2007 | 
| NRCS | National Engineering Handbook: Chapter 9 - Hydrologic Soil-Cover Complexes | 2004 | 
| NRCS | National Engineering Handbook: Chapter 10 - Estimation of Direct Runoff from Storm Rainfall | 2004 | 
| NRCS | National Engineering Handbook: Chapter 11 - Snowmelt | 2004 | 
| NRCS | National Engineering Handbook: Chapter 1 - Introduction | 1997 | 
| NRCS | Technical Release 210-39: Hydraulics of Broad-Crested Spillways | 1968 | 
| UN | Safety Guidelines and Good Practices for Tailings Management Facilities (ECE 1326665) | 2014 | 
| USACE | Drilling and Invasive Activities at Dams and Levees (ER 1110-1-1807) | 2023 | 
| USACE | Design of Hydraulic Steel Structures (ER 1110-2-2107) | 2022 | 
| USACE | Instrumentation of Embankment Dams and Levees (EM 1110-2-1908) | 2020 | 
| USACE | Best Practices in Dam and Levee Safety Risk Analysis | 2019 | 
| USACE | Construction Project Geotechnical and Materials Completion Report for Major USACE Projects | 2017 | 
| USACE | Strength Design for Reinforced Concrete Hydraulic Structures (EM 1110-2-2104) | 2016 | 
| USACE | A Guide to Public Alerts and Warnings for Dam and Levee Emergencies (EP 1110-2-17) | 2015 | 
| USACE | Safety and Health Requirements (EM 385-1-1) | 2014 | 
| USACE | Dam and Levee Safety: Using Risk-Informed Decision Making | 2012 | 
| USACE | Safety of Dams: Policy and Procedures (ER 1110-2-1156) | 2011 | 
| USACE | Demonstration of Remotely Operated Vehicles to Aid Underwater Inspection of Corps of Engineers Navigation Structures (ERDC/CRREL TR-08-15) | 2008 | 
| USACE | Earthquake Design and Evaluation of Concrete Hydraulic Structures (EM 1110-2-6053) | 2007 | 
| USACE | Interim Risk Reduction Measures for Dam Safety (EC 1110-2-6064) | 2007 | 
| USACE | Control and Topographic Surveying (EM 1110-1-1005) | 2007 | 
| USACE | Stability Analysis of Concrete Structures (EM 1110-2-2100) | 2005 | 
| USACE | General Design and Construction Considerations for Earth and Rock-Fill Dams (EM 1110-2-2300) | 2004 | 
| USACE | Slope Stability (EM 1110-2-1902) | 2003 | 
| USACE | Structural Design and Evaluation of Outlet Works (EM 1110-2-2400) | 2003 | 
| USACE | Ice Engineering (EM 1110-2-1612) | 2002 | 
| USACE | Contractor’s Guide to Contract Administration | 2002 | 
| USACE | Inspection, Evaluation, and Repair of Hydraulic Steel Structures (EM 1110-2-6054) | 2001 | 
| USACE | Design of Spillway Tainter Gates (EM 1110-2-2702) | 2000 | 
| USACE | Roller-Compacted Concrete (EM 1110-2-2006) | 2000 | 
| USACE | Response Spectra and Seismic Analysis for Concrete Hydraulic Structures (EM 1110-2-6050) | 1999 | 
| USACE | Conduits, Culverts, and Pipes (EM 1110-2-2902) | 1998 | 
| USACE | Applications of Roller-Compacted Concrete in Rehabilitation and Replacement of Hydraulic Structures (TR REMR-CS-53) | 1997 | 
| USACE | Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420) | 1997 | 
| USACE | Evaluation and Repair of Concrete Structures (EM 1110-2-2002) | 1995 | 
| USACE | Geophysical Exploration for Engineering and Environmental Investigations (EM 1110-1-1802) | 1995 | 
| USACE | Gravity Dam Design (EM 1110-2-2200) | 1995 | 
| USACE | Chemical Grouting (EM 1110-1-3500) | 1995 | 
| USACE | Waterstops and Other Preformed Joint Materials for Civil Works Structures (EM 1110-2-2102) | 1995 | 
| USACE | Rock Foundations (EM 1110-1-2908) | 1994 | 
| USACE | Seismic Design for Civil Works Buildings (ETL 1110-2-366) | 1994 | 
| USACE | Standard Practice for Concrete for Civil Works Structures (EM 1110-2-2000) | 1994 | 
| USACE | Test Quarries and Test Fills (EM 1110-2-2301) | 1994 | 
| USACE | Arch Dam Design (EM 1110-2-2201) | 1994 | 
| USACE | Seepage Analysis and Control for Dams (EM 1110-2-1901) | 1993 | 
| USACE | Hydraulic Design of Spillways (EM 1110-2-1603) | 1992 | 
| USACE | Settlement Analysis (EM 1110-1-1904) | 1990 | 
| USACE | A Guide to Effective Contractor Quality Control (CQC) (EP 715-1-2) | 1990 | 
| USACE | Instrumentation for Concrete Structures (EM 1110-2-4300) | 1987 | 
| USACE | Sliding Stability for Concrete Structures (ETL 1110-2-256) | 1981 | 
| USACE | Hydraulic Design of Reservoir Outlet Works (EM 1110-2-1602) | 1980 | 
| USACE | National Program for Inspection of Non-Federal Dams (EM 1110-2-106) | 1980 | 
| USACE | Ice Pressure on Engineering Structures (CRREL III-B1b) | 1970 | 
| USBR | Design Standards No. 14:  Appurtenant Structures for Dams (Ch. 3:  General Spillway Design Considerations) | 2022 | 
| USBR | Design Standards No. 14:  Appurtenant Structures for Dams (Ch. 4:  General Outlet Works Design Considerations) | 2022 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 6:  Freeboard) | 2021 | 
| USBR | USA Dam Removal Experience and Planning (ENV-2021-97) | 2021 | 
| USBR | Best Practices in Dam and Levee Safety Risk Analysis | 2019 | 
| USBR | Flood Inundation Mapping | 2019 | 
| USBR | Design Standards No. 12:  Plant Testing (Ch. 1:  Synchronous Generator, Motor, and Generator/Motor Field Tests) | 2018 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 20:  Geomembranes) | 2018 | 
| USBR | Design Standards No. 6:  Hydraulic and Mechanical Equipment (Ch. 6:  Bulkhead Gates and Stoplogs) | 2018 | 
| USBR | Dam Removal Analysis Guidelines for Sediment | 2017 | 
| USBR | Design and Construction Considerations for Hydraulic Structures: Roller-Compacted Concrete, 2nd Edition | 2017 | 
| USBR | Design Standards No. 6:  Hydraulic and Mechanical Equipment (Ch. 18:  Engine-Generator Sets) | 2017 | 
| USBR | Design Standards No. 6:  Hydraulic and Mechanical Equipment (Ch. 12:  Trashracks and Trashrack Cleaning Devices) | 2016 | 
| USBR | Design Standards No. 6:  Hydraulic and Mechanical Equipment (Ch. 14:  Auxiliary Mechanical Systems) | 2016 | 
| USBR | Design Standards No. 6:  Hydraulic and Mechanical Equipment (Ch. 16:  Machine Shop Equipment) | 2016 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 13:  Seismic Analysis and Design) | 2015 | 
| USBR | Design Standards No. 4:  Electrical Infrastructure – Plants and Switchyards (Ch. 3:  Plant Machine-Voltage Equipment) | 2015 | 
| USBR | Guide to Concrete Repair | 2015 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 11:  Instrumentation and Monitoring) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 15:  Foundation Grouting) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 16:  Cutoff Walls) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 19:  Geotextiles) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 21:  Water Removal and Control:  Dewatering and Unwatering Systems) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 7:  Riprap Slope Protection) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 8:  Seepage) | 2014 | 
| USBR | Design Standards No. 3:  Water Conveyance Facilities, Fish Facilities, and Roads and Bridges (Ch. 4:  Tunnels, Shafts, and Caverns) | 2014 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 17:  Soil-Cement Slope Protection) | 2013 | 
| USBR | Design Standards No. 14:  Appurtenant Structures for Dams (Ch. 2:  Hydrologic Considerations) | 2013 | 
| USBR | Design Standards No. 6:  Hydraulic and Mechanical Equipment (Ch. 11:  Heating, Ventilation, and Air-Conditioning Systems) | 2013 | 
| USBR | Design Standards No. 1:  General Design Standards | 2012 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 10:  Embankment Construction) | 2012 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 12:  Foundation and Earth Materials Investigation) | 2012 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 2:  Embankment Design) | 2012 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 3:  Foundation Surface Treatment) | 2012 | 
| USBR | Design Standards No. 9:  Buildings and Other Structures (Ch. 13:  Seismic Design) | 2012 | 
| USBR | Design Standards No. 9:  Buildings and Other Structures (Ch. 8:  Modification of Existing Buildings) | 2012 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 1:  General Design Standards) | 2011 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 4:  Static Stability Analysis) | 2011 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 5:  Protective Filters) | 2011 | 
| USBR | Design Standards No. 13:  Embankment Dams (Ch. 9:  Static Deformation Analysis) | 2011 | 
| USBR | Design Standards No. 14:  Appurtenant Structures for Dams (Ch. 1:  Introduction) | 2011 | 
| USBR | Water Measurement Manual | 2001 | 
| USBR | Concrete Manual (Part 2) | 1992 | 
| USBR | Cavitation in Chutes and Spillways (EM 42) | 1990 | 
| USBR | Criteria and Guidelines for Evacuating Storage Reservoirs and Sizing Low-Level Outlet Works (ACER TM No. 3) | 1990 | 
| USBR | Flood Hydrology Manual | 1989 | 
| USBR | Downstream Hazard Classification Guidelines (ACER TM 11) | 1988 | 
| USBR | Concrete Manual (Part 1) | 1988 | 
| USBR | Design of Small Dams | 1987 | 
| USBR | Hydraulic Design of Stilling Basins and Energy Dissipators (EM 25) | 1984 | 
| USBR | Design Criteria for Concrete Arch and Gravity Dams (EM 19) | 1977 | 
| USBR | Design of Arch Dams | 1977 | 
| USBR | Design of Gravity Dams | 1976 | 
| USGS | Guidelines for Determining Flood Flow Frequency (Bulletin 17C) | 2019 | 
| USGS | Frequency Curves | 1989 | 
| USGS | Measurement of Peak Discharge at Dams by Indirect Method | 1968 | 
| USGS | Discharge Characteristics of Broad-Crested Weirs (GSC-397) | 1967 |