All public logs
Combined display of all available logs of ASDSO Dam Safety Toolbox. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 19:49, 21 June 2024 [email protected] talk contribs created page Pre-Modeling Communication: Slope Stability Model Considerations (Created page with "● State the software selection and describe the limitations of the program as they apply to this project. ● State whether a two-dimensional or three-dimensional model will be used. Consider a phased approach if there is uncertainty whether the problem warrants a two-dimensional or three-dimensional model. Document reasons for this uncertainty. ● Describe the basis for material parameters to be selected. Summarize existing materials and new materials. ● Note...")
- 19:24, 21 June 2024 [email protected] talk contribs created page Step 4 of Pre-Analysis Communication: Proceed with Modeling and Keep Communication Channels Open (Created page with "After the scope of work is developed, agreed upon by the dam owner and engineer, and a corresponding modeling plan is approved by the regulatory agency, the modeling effort can begin. After the consultant or modeler has collected and reviewed all pertinent data and performed preliminary analysis, it may be beneficial to hold an additional meeting with the owner or both the owner and regulator. This allows the project team to reassess key assumptions and further agree upo...")
- 19:23, 21 June 2024 [email protected] talk contribs created page Step 3 of Pre-Analysis Communication: Obtain Concurrence from Regulatory Agency (Created page with "Once the owner and modeler have agreed upon a scope of work, it is time to involve the regulatory agency or agencies. To do so, a meeting can be held to present portions of the agreed upon Scope of Work such as: • Purpose of the model • Justification for model in terms of regulatory agency requirements • Modeling approach, including software, assumptions, scenarios, validation/calibration plan, etc. • Quality assurance plan • Anticipated schedule including t...")
- 19:22, 21 June 2024 [email protected] talk contribs created page Step 2 of Pre-Analysis Communication: Develop Scope of Work (Created page with "Once each of the aforementioned items have been evaluated and project objectives are understood, the owner and/or modeler will have the key information necessary to develop an adequate scope of work for the modeling effort. The scope of work should include all tasks needed to fulfill the model’s purpose.")
- 19:15, 21 June 2024 [email protected] talk contribs created page Step 1 of Pre-Analysis Communication: Develop Project Understanding and Objectives (Created page with "Prior to commencing any modeling effort, an understanding of the model objectives, project constraints, and overall approach should be developed. In order to develop this project understanding, the dam owner and engineer/modeler should meet to discuss the modeling approach, including items that can substantially impact cost and/or schedule. Commonly, the regulator is not involved in early scope of work discussions that have financial or contractual components.")
- 19:15, 21 June 2024 [email protected] talk contribs changed group membership for [email protected] from Users, automoderated user and moderator to Users
- 19:14, 21 June 2024 [email protected] talk contribs changed group membership for [email protected] from Users to Users, automoderated user and moderator
- 19:12, 21 June 2024 [email protected] talk contribs created page File:FlowChart.jpg
- 19:12, 21 June 2024 [email protected] talk contribs uploaded File:FlowChart.jpg
- 17:33, 21 June 2024 [email protected] talk contribs created page Engineering Analysis (Created page with "<!-- Default code to remove table of contents and add line break at top of page --> __NOTOC__ <!-- Add Category to drive breadcrumb menus --> Category: Engineering ---- <!-- Introductory paragraph or topic page summary --> Engineers use many methods to analyze existing or proposed dams. This includes hand calculations, empirical methods, and computational methods or software. The complexity and data/resource requirements of these various analytic procedures varies...")
- 17:17, 21 June 2024 [email protected] talk contribs created page Pre-Analysis Communication Best Practices (Created page with "<!-- Default code to remove table of contents and add line break at top of page --> __NOTOC__ <!-- Add Category to drive breadcrumb menus --> Category:Undefined ---- <!-- Insert image using {{Picture}} template --> {{Picture <!-- Add image file name (ex.image.jpg) --> |image= 1.jpg <!--Add link if applicable --> |link= <!-- Add picture caption --> |caption= This is a dam. }} == Purpose == Paragraph text == Levels of Pre-Analysis Communication == Paragraph text ==...")
- 16:57, 21 June 2024 [email protected] talk contribs created page Modeling Communication (Created page with "<!-- Default code to remove table of contents and add line break at top of page --> __NOTOC__ <!-- Add Category to drive breadcrumb menus --> Category:Undefined ---- <!-- Introductory paragraph or topic page summary --> Paragraph text == Introduction == This topic page provides a framework for communication as part of the development of hydrologic, hydraulic, seepage, and stability models. It applies to engineers/modelers, dam owners, and regulatory agencies. Compu...")
- 16:10, 21 June 2024 [email protected] talk contribs changed group membership for [email protected] from Users and moderator to Users, moderator and automoderated user
- 21:35, 20 June 2024 User account [email protected] talk contribs was created automatically
- 21:01, 20 June 2024 User account [email protected] talk contribs was created automatically
- 17:51, 20 June 2024 User account [email protected] talk contribs was created automatically
- 17:20, 20 June 2024 User account [email protected] talk contribs was created automatically
- 20:58, 18 June 2024 User account [email protected] talk contribs was created automatically
- 15:04, 18 June 2024 User account [email protected] talk contribs was created automatically
- 14:54, 18 June 2024 User account [email protected] talk contribs was created automatically
- 00:26, 18 June 2024 User account [email protected] talk contribs was created automatically
- 18:53, 15 June 2024 User account [email protected] talk contribs was created automatically
- 15:16, 13 June 2024 User account [email protected] talk contribs was created automatically
- 16:12, 11 June 2024 User account [email protected] talk contribs was created automatically
- 13:33, 11 June 2024 User account [email protected] talk contribs was created automatically
- 06:01, 11 June 2024 User account [email protected] talk contribs was created automatically
- 18:57, 10 June 2024 User account [email protected] talk contribs was created automatically
- 10:12, 10 June 2024 User account Nawin [email protected] talk contribs was created automatically
- 12:50, 7 June 2024 User account [email protected] talk contribs was created automatically
- 21:54, 6 June 2024 User account [email protected] talk contribs was created automatically
- 01:08, 6 June 2024 User account [email protected] talk contribs was created automatically
- 19:07, 5 June 2024 [email protected] talk contribs created page Talk:Precast Concrete Blocks (Created page with "Would it be useful to talk about the advantage of ''tapered'' ACBs?")
- 17:54, 5 June 2024 User account [email protected] talk contribs was created automatically
- 14:34, 5 June 2024 User account [email protected] talk contribs was created automatically
- 19:43, 3 June 2024 User account [email protected] talk contribs was created automatically
- 17:12, 3 June 2024 User account [email protected] talk contribs was created automatically
- 16:03, 3 June 2024 User account [email protected] talk contribs was created automatically
- 20:15, 2 June 2024 User account [email protected] talk contribs was created automatically
- 16:04, 1 June 2024 User account [email protected] talk contribs was created automatically
- 21:15, 31 May 2024 User account [email protected] talk contribs was created automatically
- 18:01, 31 May 2024 User account [email protected] talk contribs was created automatically
- 17:59, 31 May 2024 User account [email protected] talk contribs was created automatically
- 16:24, 31 May 2024 User account [email protected] talk contribs was created automatically
- 15:02, 31 May 2024 User account [email protected] talk contribs was created automatically
- 14:45, 31 May 2024 User account [email protected] talk contribs was created automatically
- 13:38, 31 May 2024 User account [email protected] talk contribs was created automatically
- 20:48, 29 May 2024 User account [email protected] talk contribs was created automatically
- 15:03, 29 May 2024 [email protected] talk contribs created page On-Demand Webinar : Latest Trends in Roller-Compacted Concrete (RCC) Spillways and Overtopping Protection (Created page with "{{Trainings Template |author= <!-- Add author/publisher below--> Association of State Dam Safety Officials |year= <!-- Add publication year --> 2023 |abstract= <!-- Add presentation summary--> This webinar will provide the latest details in design trends, mix designs, control sections, and construction means and methods for roller-compacted concrete (RCC) spillways and overtopping protection. With projects now over 40 years in service, it is clear which design criter...")
- 15:03, 29 May 2024 [email protected] talk contribs created page On-Demand Webinar : Exploring Dam Breach Parameters, Observed and Modeled (Created page with "{{Trainings Template |author= <!-- Add author/publisher below--> Association of State Dam Safety Officials |year= <!-- Add publication year --> 2023 |abstract= <!-- Add presentation summary--> Dam breach modeling is commonly used to classify the hazard potential of a dam, establish the inflow design flood and other design criteria of a dam, and plan for emergency response in the event of an incident or failure. Dam breach analyses are also an essential component of r...")
- 15:02, 29 May 2024 [email protected] talk contribs created page On-Demand Webinar : Best Practices for Dam Safety Warning Signs (Created page with "{{Trainings Template |author= <!-- Add author/publisher below--> Association of State Dam Safety Officials |year= <!-- Add publication year --> 2023 |abstract= <!-- Add presentation summary--> FEMA’s Dam Safety Warning Signs Best Practices is a compilation of existing leading practices from industry leaders to provide nationwide guidelines for consistent signage to improve public safety around dams. Through this webinar, attendees will learn about the importance of...")