==Best Practices Resources==
==Best Practices Resources==
{{Document Icon}} [[Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations) | Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations), USBR, 2022]]
{{Document Icon}} [[Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations) | Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations), USBR]]
{{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | Technical Release 210-60: Earth Dams and Reservoirs, NRCS, 2019]]
{{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | Technical Release 210-60: Earth Dams and Reservoirs, NRCS]]
{{Document Icon}} [[Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams, FERC, 2015]]
{{Document Icon}} [[Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams, FERC]]
{{Document Icon}} [[National Engineering Handbook: Chapter 17 - Flood Routing | National Engineering Handbook: Chapter 17 - Flood Routing, NRCS, 2014]]
{{Document Icon}} [[National Engineering Handbook: Chapter 17 - Flood Routing | National Engineering Handbook: Chapter 17 - Flood Routing, NRCS]]
{{Document Icon}} [[Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94) | Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94), FEMA, 2013]]
{{Document Icon}} [[Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94) | Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94), FEMA]]
{{Document Icon}} [[Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood, FERC, 2001]]
{{Document Icon}} [[Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood, FERC]]
{{Document Icon}} [[Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420) | Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420), USACE, 1997]]
{{Document Icon}} [[Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420) | Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420), USACE]]
{{Document Icon}} [[Hydraulic Design of Spillways (EM 1110-2-1603) | Hydraulic Design of Spillways (EM 1110-2-1603), USACE, 1992]]
{{Document Icon}} [[Hydraulic Design of Spillways (EM 1110-2-1603) | Hydraulic Design of Spillways (EM 1110-2-1603), USACE]]


==Trainings==
==Trainings==

Latest revision as of 16:52, 11 July 2023


“This procedure derives the outflow hydrograph from a reservoir from the inflow hydrograph into the reservoir with consideration of elevation, storage, and discharge characteristics of the reservoir and spillways. The conservation of mass equation is solved with the assumption that outflow discharge and volume of storage are directly related.” [1]

“For reservoirs, the relation of surface area and release capacity to storage content must be described. Characteristics of the control gates on the outlets and spillway must be known in order to determine constraints on operation. The top-of-dam elevation must be specified and the ability of the structure to withstand overtopping must be assessed.” [2].

Best Practices Resources

Design Standards No. 14: Appurtenant Structures for Dams (Ch. 3: General Spillway Design Considerations), USBR

Technical Release 210-60: Earth Dams and Reservoirs, NRCS

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 2- Selecting and Accommodating Inflow Design Floods for Dams, FERC

National Engineering Handbook: Chapter 17 - Flood Routing, NRCS

Selecting and Accommodating Inflow Design Floods for Dams (FEMA P-94), FEMA

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 8- Determination of the Probable Maximum Flood, FERC

Hydrologic Engineering Requirements for Reservoirs (EM 1110-2-1420), USACE

Hydraulic Design of Spillways (EM 1110-2-1603), USACE

Trainings

On-Demand Webinar: Inspection and Assessment of Spillways

On-Demand Webinar: Inlet and Outlet Hydraulics for Spillways and Outlet Structures

On-Demand Webinar: Designing Spillways to Mitigate Failure Modes