Rehabilitation: Difference between revisions
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
Line 23: | Line 23: | ||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS | {{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS]] | ||
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR | {{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR]] | ||
{{Document Icon}} [[Inspection, Evaluation, and Repair of Hydraulic Steel Structures (EM 1110-2-6054) | Inspection, Evaluation, and Repair of Hydraulic Steel Structures (EM 1110-2-6054), USACE | {{Document Icon}} [[Inspection, Evaluation, and Repair of Hydraulic Steel Structures (EM 1110-2-6054) | Inspection, Evaluation, and Repair of Hydraulic Steel Structures (EM 1110-2-6054), USACE]] | ||
{{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE | {{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE]] | ||
{{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE | {{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE]] | ||
==Trainings== | ==Trainings== |
Latest revision as of 22:11, 11 July 2023
There are currently over 90,000 dams in the United States National Inventory of Dams (NID), with 76% of these having a High Hazard Potential classification and and average age of 60 years.[1] As a result of the high consequences that accompany the failure of any High Hazard Potential dam, the rehabilitation of these aging structures becomes increasingly necessary.
The planning and rehabilitation design of an existing dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to:
- Legal Agreements
- Permitting
- Public Outreach
- Hazard Potential Classification (including consideration of hazard creep)
- Water Demand / Population Studies
- Benefit-Cost Analyses
- Hydrologic Studies
- Environmental Impact Studies
- Geologic and Geotechnical Investigations
- Seismic Investigations
- Structural / Embankment Design
- Hydraulic Design
- Risk Communication
- Construction Management
Best Practices Resources
TR-210-60 Earth Dams and Reservoirs, NRCS
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR
Inspection, Evaluation, and Repair of Hydraulic Steel Structures (EM 1110-2-6054), USACE
Arch Dam Design (EM 1110-2-2201), USACE
Gravity Dam Design (EM 1110-2-2200), USACE
Trainings
Dam Owner Academy: Rehabilitation Projects
On-Demand Webinar: Field Investigations for New and Existing Dams
On-Demand Webinar: Rehabilitation of NRCS Watershed Structures – A Consultant’s Perspective
On-Demand Webinar: Seepage Rehabilitation for Embankment Dams
On-Demand Webinar: Rehabilitation of Concrete Dams
On-Demand Webinar: Concrete Repair and Maintenance for Dams
On-Demand Webinar: Low-Level Conduits – What Can Go Wrong, How to Inspect, How to Repair?
On-Demand Webinar: Why Embankments Crack and How to Fix Them
Citations:
- ↑ National Inventory of Dams, USACE, 2022
Revision ID: 7189
Revision Date: 07/11/2023