ASDSO Dam Safety Toolbox

Design and Construction of Auxiliary Spillways: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> “The general considerations for selecting the type and size of a new spillway and/or modifying an existing spillway include: project requirements (frequency and duration of operation, along with flood control requirements); dam type (concrete, embankment, composite); site conditions (topography, geology, and climate); hydrologic and seismic loading requirem...")
 
No edit summary
Line 1: Line 1:
__NOTOC__
__NOTOC__
[[Category:Auxiliary Spillways]]
----
----
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->
“The general considerations for selecting the type and size of a new spillway and/or modifying an existing spillway include: project requirements (frequency and duration of operation, along with flood control requirements); dam type (concrete, embankment, composite); site conditions (topography, geology, and climate); hydrologic and seismic loading requirements; and diversion during construction requirements”.<ref name="DS14">[[Design Standard No. 14: Appurtenant Structures for Dams (Spillways and Outlet Works) | Design Standard No. 14: Appurtenant Structures for Dams (Spillways and Outlet Works), USBR, 2014]]</ref>
“The general considerations for selecting the type and size of a new spillway and/or modifying an existing spillway include: project requirements (frequency and duration of [[operation]], along with flood control requirements); dam type (concrete, embankment, composite); site conditions (topography, geology, and climate); hydrologic and [[seismic]] loading requirements; and diversion during [[construction]] requirements”.<ref name="DS14">[[Design Standard No. 14: Appurtenant Structures for Dams (Spillways and Outlet Works) | Design Standard No. 14: Appurtenant Structures for Dams (Spillways and Outlet Works), USBR, 2014]]</ref>


==Examples==
==Examples==

Revision as of 06:53, 18 November 2022


“The general considerations for selecting the type and size of a new spillway and/or modifying an existing spillway include: project requirements (frequency and duration of operation, along with flood control requirements); dam type (concrete, embankment, composite); site conditions (topography, geology, and climate); hydrologic and seismic loading requirements; and diversion during construction requirements”.[1]

Examples

Best Practices Resources

Design Standard No. 14: Appurtenant Structures for Dams (Spillways and Outlet Works)

Trainings


Citations:


Revision ID: 4544
Revision Date: 11/18/2022