==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS | {{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS]] | ||
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR | {{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR]] | ||
{{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA | {{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA]] | ||
{{Document Icon}} [[Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) | Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333), FEMA | {{Document Icon}} [[Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) | Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333), FEMA]] | ||
{{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE | {{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE]] | ||
{{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE | {{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE]] | ||
==Trainings== | ==Trainings== |
Revision as of 20:41, 11 July 2023
Construction of the Shasta Dam in California between 1938 and 1945. |
The planning, design, and construction of a new dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to:
- Legal Agreements
- Permitting
- Public Outreach
- Hazard Potential Classification
- Water Demand / Population Studies
- Benefit-Cost Analyses
- Hydrologic Studies
- Environmental Impact Studies
- Reservoir Sedimentation Analyses
- Preliminary Site Investigations
- Geologic and Geotechnical Investigations
- Seismic Investigations
- Structural / Embankment Design
- Hydraulic Design
- Creation of an Operation and Maintenance Program
- Risk Communication
- Construction Management
Best Practices Resources
TR-210-60 Earth Dams and Reservoirs, NRCS
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR
Federal Guidelines for Dam Safety (FEMA P-93), FEMA
Arch Dam Design (EM 1110-2-2201), USACE
Gravity Dam Design (EM 1110-2-2200), USACE
Trainings
On-Demand Webinar: Field Investigations for New and Existing Dams
On-Demand Webinar: Risk Assessment Basics for an Individual Dam