Site Planning: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
---- | ---- | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
Site planning for a new dam or [[rehabilitation]] design "should be developed in accordance with state-of-the-art design techniques and [[construction]] practices and in a manner commensurate with its size, function, geologic setting, and potential hazard classification. Careful attention must be given to the following planning and design considerations: | |||
[ | #Selection of the dam site | ||
#Estimation of the PMF and selection of the IDF | |||
#Identification of earthquake source area and structure, estimation of MCE’s, and identification of earthquake-related safety concerns | |||
#Development of a site-specific geotechnical exploration program | |||
#Design of the foundation, dam, and appurtenant structures | |||
#Design of a system of instrumentation to monitor the performance of the dam, foundation, and appurtenant structures | |||
= | #Development of an initial reservoir-filling and surveillance plan and of reservoir drawdown criteria | ||
#Preparation of designer’s operating criteria and identification of special considerations to be observed during construction and [[operation]] | |||
#Provisions for the automatic, independent review by competent individuals of all design decisions, methods, procedures, and results related to dam safety | |||
#Provisions to revise the design to make it compatible with conditions encountered during construction." <ref name="Small Dams">[[Design of Small Dams| Design of Small Dams (United States Bureau of Reclamation, 1987)]]</ref> | |||
<!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> | <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> |
Revision as of 20:56, 12 December 2022
Site planning for a new dam or rehabilitation design "should be developed in accordance with state-of-the-art design techniques and construction practices and in a manner commensurate with its size, function, geologic setting, and potential hazard classification. Careful attention must be given to the following planning and design considerations:
- Selection of the dam site
- Estimation of the PMF and selection of the IDF
- Identification of earthquake source area and structure, estimation of MCE’s, and identification of earthquake-related safety concerns
- Development of a site-specific geotechnical exploration program
- Design of the foundation, dam, and appurtenant structures
- Design of a system of instrumentation to monitor the performance of the dam, foundation, and appurtenant structures
- Development of an initial reservoir-filling and surveillance plan and of reservoir drawdown criteria
- Preparation of designer’s operating criteria and identification of special considerations to be observed during construction and operation
- Provisions for the automatic, independent review by competent individuals of all design decisions, methods, procedures, and results related to dam safety
- Provisions to revise the design to make it compatible with conditions encountered during construction." [1]
Citations:
Revision ID: 5186
Revision Date: 12/12/2022