New Dams: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
(11 intermediate revisions by 3 users not shown) | |||
Line 9: | Line 9: | ||
<!-- Add picture caption --> | <!-- Add picture caption --> | ||
|caption= Construction of the Shasta Dam in California between 1938 and 1945. | |caption= Construction of the Shasta Dam in California between 1938 and 1945. | ||
(Image Source: Library of Congress Prints and Photographs Division) | |||
}} | }} | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
The planning, design, and [[construction]] of a new dam requires many different tasks involving a variety of disciplines | The planning, design, and [[construction]] of a new dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to: | ||
* Legal | * Legal Agreements | ||
* [[Permitting]] | * [[Permitting]] | ||
* | * Public Outreach | ||
* [[Hazard Potential]] | * [[Hazard Potential Classification]] | ||
* Water | * Water Demand / Population Studies | ||
* Benefit- | * Benefit-Cost Analyses | ||
* [[Hydrology | Hydrologic]] | * [[Hydrology | Hydrologic]] Studies | ||
* [[Environmental]] | * [[Environmental]] Impact Studies | ||
* [[ | * [[Sedimentation| Reservoir Sedimentation Analyses]] | ||
* [[Geotechnical Exploration | Preliminary Site Investigations]] | |||
* [[Geotechnical and Geology | Geologic and | * [[Geotechnical and Geology | Geologic and Geotechnical]] Investigations | ||
* [[Seismic]] | * [[Seismic]] Investigations | ||
* [[Structural]] / | * [[Structural]] / Embankment Design | ||
* [[Hydraulics | Hydraulic]] | * [[Hydraulics | Hydraulic]] Design | ||
* Creation of an [[Operation & Maintenance | | * Creation of an [[Operation & Maintenance | Operation and Maintenance]] Program | ||
* | * [[Risk Management for Dam Safety | Risk Communication]] | ||
* [[Construction]] Management | |||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[ | {{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS]] | ||
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR]] | |||
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR | {{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA]] | ||
{{Document Icon}} [[Federal Guidelines for Dam Safety | Federal Guidelines for Dam Safety, FEMA | {{Document Icon}} [[Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) | Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333), FEMA]] | ||
{{Document Icon}} [[ | {{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE]] | ||
{{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE]] | |||
==Trainings== | ==Trainings== |
Latest revision as of 04:23, 21 July 2023
Construction of the Shasta Dam in California between 1938 and 1945.
(Image Source: Library of Congress Prints and Photographs Division) |
The planning, design, and construction of a new dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to:
- Legal Agreements
- Permitting
- Public Outreach
- Hazard Potential Classification
- Water Demand / Population Studies
- Benefit-Cost Analyses
- Hydrologic Studies
- Environmental Impact Studies
- Reservoir Sedimentation Analyses
- Preliminary Site Investigations
- Geologic and Geotechnical Investigations
- Seismic Investigations
- Structural / Embankment Design
- Hydraulic Design
- Creation of an Operation and Maintenance Program
- Risk Communication
- Construction Management
Best Practices Resources
TR-210-60 Earth Dams and Reservoirs, NRCS
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR
Federal Guidelines for Dam Safety (FEMA P-93), FEMA
Arch Dam Design (EM 1110-2-2201), USACE
Gravity Dam Design (EM 1110-2-2200), USACE
Trainings
On-Demand Webinar: Field Investigations for New and Existing Dams
On-Demand Webinar: Risk Assessment Basics for an Individual Dam
Citations:
Revision ID: 7357
Revision Date: 07/21/2023