Site Planning: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 3: | Line 3: | ||
---- | ---- | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
Site planning for a new dam or [[rehabilitation]] design "should be developed in accordance with state-of-the-art design techniques and [[construction]] practices and in a manner commensurate with its size, function, geologic setting, and potential hazard classification. Careful attention must be given to the following planning and design considerations": | |||
[ | #"Selection of the dam site | ||
#Evaluation of geologic setting and hazard potential | |||
#"Estimation of the PMF and selection of the IDF | |||
#"Identification of earthquake source area and structure, estimation of MCE’s, and identification of earthquake-related safety concerns | |||
#"Development of a site-specific [[Geotechnical Exploration|geotechnical exploration]] program | |||
#"Design of the foundation, dam, and appurtenant structures | |||
= | #"Design of a system of instrumentation to monitor the performance of the dam, foundation, and appurtenant structures | ||
#"Development of an initial reservoir-filling and surveillance plan and of [[Reservoir Drawdown|reservoir drawdown]] criteria | |||
#"Preparation of designer’s operating criteria and identification of special considerations to be observed during construction and [[operation]] | |||
#"Provisions for the automatic, independent review by competent individuals of all design decisions, methods, procedures, and results related to dam safety | |||
#"Provisions to revise the design to make it compatible with conditions encountered during construction." <ref name="Small Dams">[[Design of Small Dams | Design of Small Dams, USBR, 1987]]</ref> | |||
<!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> | <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> |
Latest revision as of 23:45, 26 January 2023
Site planning for a new dam or rehabilitation design "should be developed in accordance with state-of-the-art design techniques and construction practices and in a manner commensurate with its size, function, geologic setting, and potential hazard classification. Careful attention must be given to the following planning and design considerations":
- "Selection of the dam site
- Evaluation of geologic setting and hazard potential
- "Estimation of the PMF and selection of the IDF
- "Identification of earthquake source area and structure, estimation of MCE’s, and identification of earthquake-related safety concerns
- "Development of a site-specific geotechnical exploration program
- "Design of the foundation, dam, and appurtenant structures
- "Design of a system of instrumentation to monitor the performance of the dam, foundation, and appurtenant structures
- "Development of an initial reservoir-filling and surveillance plan and of reservoir drawdown criteria
- "Preparation of designer’s operating criteria and identification of special considerations to be observed during construction and operation
- "Provisions for the automatic, independent review by competent individuals of all design decisions, methods, procedures, and results related to dam safety
- "Provisions to revise the design to make it compatible with conditions encountered during construction." [1]
Citations:
Revision ID: 6494
Revision Date: 01/26/2023