ASDSO Dam Safety Toolbox

Drilling: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> __NOTOC__ ---- {{Picture <!-- Add image file name (ex.image.jpg) --> |image= Geotechnical_Drilling_Rig_at_Desert_-_By_Eng._Fadi_Fayyadh_Al_Toubeh_-_panoramio.jpg <!--Add link if applicable --> |link= <!-- Add picture caption --> |caption= Drill Rig }} <!-- Introductory paragraph or topic page summary --> "Test holes are drilled to obtain representative disturbed...")
 
No edit summary
 
(10 intermediate revisions by 4 users not shown)
Line 1: Line 1:
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->  
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->  
__NOTOC__  
__NOTOC__  
[[Category:Geotechnical Exploration]]
----  
----  
{{Picture  
{{Picture  
<!-- Add image file name (ex.image.jpg) -->  
<!-- Add image file name (ex.image.jpg) -->  
Line 9: Line 11:
<!-- Add picture caption -->  
<!-- Add picture caption -->  
|caption= Drill Rig
|caption= Drill Rig
(Image Source: [https://commons.wikimedia.org/wiki/File:Geotechnical_Drilling_Rig_at_Desert_-_By_Eng._Fadi_Fayyadh_Al_Toubeh_-_panoramio.jpg Fadi Fayad Al Taoba])
}}  
}}  


<!-- Introductory paragraph or topic page summary -->  
<!-- Introductory paragraph or topic page summary -->  
"Test holes are drilled to obtain representative disturbed and undisturbed samples to:
"Test holes are drilled to obtain representative disturbed and undisturbed samples to:
*advance and clean holes to specific horizons for logging, sampling, and conducting tests;
*"advance and clean holes to specific horizons for logging, sampling, and conducting tests;
*advance holes to bedrock to delineate rock surface;
*"advance holes to bedrock to delineate rock surface;
*install piezometers and relief wells."<ref name="NEH_CH5">[[National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing | National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing, NRCS, 2012]]</ref>
*"install [[piezometers]] and [[Relief Wells|relief wells]]."<ref name="NEH_CH5">[[National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing | National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing, NRCS, 2012]]</ref>


"Disturbed samples are commonly obtained through the Standard Penetration Test, using a split-spoon sampler. Undisturbed samples are obtained by pushing or [[coring]] a tube into in situ soil materials. The most common undisturbed sampling method is the hydraulic pushing of a Shelby tube, which is referred to as a 'push-tube sample'."<ref name="NEH_CH5" />
"Disturbed samples are commonly obtained through the Standard Penetration Test (SPT), using a split-spoon sampler. Undisturbed samples are obtained by pushing or [[coring]] a tube into in situ soil materials. The most common undisturbed sampling method is the hydraulic pushing of a Shelby tube, which is referred to as a 'push-tube sample'."<ref name="NEH_CH5" />


"Test holes may be augered by hand, or through powered [[drill]] rigs that are mounted on trucks mounted rig, all-terrain rig, all-terrain vehicles, tracks, or on a barge. Selection of drilling methods depends on:
"Test holes may be augered by hand, or through powered [[drill]] rigs that are mounted on trucks mounted rig, all-terrain rig, all-terrain vehicles, tracks, or on a barge. Selection of drilling methods depends on:
*access (terrain roughness, space, and height limitations) and noise ordinance;
*"access (terrain roughness, space, and height limitations) and noise ordinance;
*types of tests or samples needed for the investigation and design needs;
*"types of tests or samples needed for the investigation and design needs;
*disposal of drilling fluids and cuttings (contaminated cuttings and [[groundwater]] may have to be handled as hazardous waste), lithology (soil type such as sand, clay, and boulders). rock type, and aquifer characteristics (depth to water)."<ref name="NEH_CH5" />
*"disposal of drilling fluids and cuttings (contaminated cuttings and [[groundwater]] may have to be handled as hazardous waste), lithology (soil type such as sand, clay, and boulders). rock type, and aquifer characteristics (depth to water)."<ref name="NEH_CH5" />


==Drilling Methods==  
==Drilling Methods==  
Line 33: Line 36:
*[[Sonic (Vibratory) Drilling]]
*[[Sonic (Vibratory) Drilling]]


==[[Best Practices Resources]]==
==<noautolinks>Best Practices Resources</noautolinks>==
{{Document Icon}} [[National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing]]
{{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | Technical Release 210-60: Earth Dams and Reservoirs, NRCS]]
{{Document Icon}} [[Drilling and Invasive Activities at Dams and Levees (ER 1110-1-1807) | Drilling and Invasive Activities at Dams and Levees (ER 1110-1-1807), USACE]]
{{Document Icon}} [[National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing | National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing, NRCS]]
{{Document Icon}} [[National Engineering Handbook: Chapter 2 - Engineering Geologic Investigations | National Engineering Handbook Chapter 2 - Engineering Geologic Investigations, NRCS]]
{{Document Icon}} [[Design of Small Dams | Design of Small Dams, USBR]]
 
==Trainings==
==Trainings==
{{Video Icon}} [[On-Demand Webinar: Drilling Plans and Hazard Evaluations for Dams and Levees]]
{{Video Icon}} [[On-Demand Webinar: Drilling Plans and Hazard Evaluations for Dams and Levees]]

Latest revision as of 19:14, 21 July 2023


Drill Rig

(Image Source: Fadi Fayad Al Taoba)

"Test holes are drilled to obtain representative disturbed and undisturbed samples to:

  • "advance and clean holes to specific horizons for logging, sampling, and conducting tests;
  • "advance holes to bedrock to delineate rock surface;
  • "install piezometers and relief wells."[1]

"Disturbed samples are commonly obtained through the Standard Penetration Test (SPT), using a split-spoon sampler. Undisturbed samples are obtained by pushing or coring a tube into in situ soil materials. The most common undisturbed sampling method is the hydraulic pushing of a Shelby tube, which is referred to as a 'push-tube sample'."[1]

"Test holes may be augered by hand, or through powered drill rigs that are mounted on trucks mounted rig, all-terrain rig, all-terrain vehicles, tracks, or on a barge. Selection of drilling methods depends on:

  • "access (terrain roughness, space, and height limitations) and noise ordinance;
  • "types of tests or samples needed for the investigation and design needs;
  • "disposal of drilling fluids and cuttings (contaminated cuttings and groundwater may have to be handled as hazardous waste), lithology (soil type such as sand, clay, and boulders). rock type, and aquifer characteristics (depth to water)."[1]

Drilling Methods

Best Practices Resources

Technical Release 210-60: Earth Dams and Reservoirs, NRCS

Drilling and Invasive Activities at Dams and Levees (ER 1110-1-1807), USACE

National Engineering Handbook: Chapter 5 - Engineering Geology Logging, Sampling, and Testing, NRCS

National Engineering Handbook Chapter 2 - Engineering Geologic Investigations, NRCS

Design of Small Dams, USBR

Trainings

On-Demand Webinar: Drilling Plans and Hazard Evaluations for Dams and Levees

On-Demand Webinar: The Practical Use of Geophysics to Assess Dam and Levee Safety



Citations:



Revision ID: 7405
Revision Date: 07/21/2023