ASDSO Dam Safety Toolbox

Underwater Construction: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Divers may be required to complete construction.'' </div> ----</br> <!-- Add body paragraphs here --> At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. The Willow Creek dam is an earthen dam constructed in 1966 that impounds a...")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<!--Example Page -->
[[Category:Construction Considerations Outlet Works]]
<div style= "text-align:center;">
----
<!-- Add message here -->
''' ''Message: Divers may be required to complete [[construction]].'' '''
''Message: Divers may be required to complete construction.''
 
</div>
----</br>
<!-- Add body paragraphs here -->
<!-- Add body paragraphs here -->
At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required.
At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required.


The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks:
The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the [[Colorado]] River. A project was completed to rehabilitate the existing outlet works that included the following tasks:


*Install 20' pipe segment with blind flange.
*Install 20' pipe segment with blind flange.
Line 29: Line 27:
</gallery>
</gallery>


''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.''
[[Category:Example Pages]]
[[Category:Example Pages]]
{{Revhistinf}}
{{Revhistinf}}

Latest revision as of 03:33, 2 December 2022


Message: Divers may be required to complete construction.

At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required.

The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks:

  • Install 20' pipe segment with blind flange.
  • Reline existing outlet works with steel pipe and replace 2 existing valves in the dry.
  • Add new hydraulically operated gate valve.
  • Install trash rack and run hydraulic lines.


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4770
Revision Date: 12/02/2022