ASDSO Dam Safety Toolbox

Anticipate dewatering problems in advance: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Wells are only effective if they are strategically placed and coordinated with each other'' </div> ----</br> <!-- Add body paragraphs here --> Lake Frances Dam was built in 1909, is 64 feet high, and stores 105,000 acre feet. Lake frances was ungoing a major rehab of the outlet works – involved replacement of the upstream section and sliplining the downstream section with steel...")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<!--Example Page -->
[[Category:Construction Considerations Outlet Works]]
<div style= "text-align:center;">
----
<!-- Add message here -->
''' ''Message: Wells are only effective if they are strategically placed and coordinated with each other'' '''
''Message: Wells are only effective if they are strategically placed and coordinated with each other''
 
</div>
----</br>
<!-- Add body paragraphs here -->
<!-- Add body paragraphs here -->
Lake Frances Dam was built in 1909, is 64 feet high, and stores 105,000 acre feet. Lake frances was ungoing a major rehab of the outlet works – involved replacement of the upstream section and sliplining the downstream section with steel pipe. A canal company was responsible for earthwork and dewatering and a contractor was hired for the sliplining operations.
Lake Frances Dam was built in 1909, is 64 feet high, and stores 105,000 acre feet. Lake frances was ungoing a major rehab of the outlet works – involved [[replacement]] of the upstream section and sliplining the downstream section with steel pipe. A canal company was responsible for earthwork and [[dewatering]] and a contractor was hired for the sliplining operations.


Lessons learned:
Lessons learned:
*Dewatering can make or break a project, especially with fall construction – anticipate problems in advance
*Dewatering can make or break a project, especially with fall [[construction]] – anticipate problems in advance
*You can tell right away if your dewatering system isn't working – don’t delay in trying something else.
*You can tell right away if your dewatering system isn't working – don’t delay in trying something else.
*Calling in the experts can save you money in the long run.
*Calling in the experts can save you money in the long run.
Line 24: Line 22:
</gallery>
</gallery>


''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.''
[[Category:Example Pages]]
[[Category:Example Pages]]
{{Revhistinf}}
{{Revhistinf}}

Latest revision as of 03:33, 2 December 2022


Message: Wells are only effective if they are strategically placed and coordinated with each other

Lake Frances Dam was built in 1909, is 64 feet high, and stores 105,000 acre feet. Lake frances was ungoing a major rehab of the outlet works – involved replacement of the upstream section and sliplining the downstream section with steel pipe. A canal company was responsible for earthwork and dewatering and a contractor was hired for the sliplining operations.

Lessons learned:

  • Dewatering can make or break a project, especially with fall construction – anticipate problems in advance
  • You can tell right away if your dewatering system isn't working – don’t delay in trying something else.
  • Calling in the experts can save you money in the long run.
  • Wells are only effective if they are strategically placed and coordinated with each other


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4769
Revision Date: 12/02/2022