New Dams: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 9: | Line 9: | ||
<!-- Add picture caption --> | <!-- Add picture caption --> | ||
|caption= Construction of the Shasta Dam in California between 1938 and 1945. | |caption= Construction of the Shasta Dam in California between 1938 and 1945. | ||
(Image Source: Library of Congress Prints and Photographs Division) | |||
}} | }} | ||
Line 33: | Line 34: | ||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS | {{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS]] | ||
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR | {{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR]] | ||
{{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA | {{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA]] | ||
{{Document Icon}} [[ | {{Document Icon}} [[Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) | Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333), FEMA]] | ||
{{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE]] | |||
{{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE]] | |||
==Trainings== | ==Trainings== |
Latest revision as of 04:23, 21 July 2023
Construction of the Shasta Dam in California between 1938 and 1945.
(Image Source: Library of Congress Prints and Photographs Division) |
The planning, design, and construction of a new dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to:
- Legal Agreements
- Permitting
- Public Outreach
- Hazard Potential Classification
- Water Demand / Population Studies
- Benefit-Cost Analyses
- Hydrologic Studies
- Environmental Impact Studies
- Reservoir Sedimentation Analyses
- Preliminary Site Investigations
- Geologic and Geotechnical Investigations
- Seismic Investigations
- Structural / Embankment Design
- Hydraulic Design
- Creation of an Operation and Maintenance Program
- Risk Communication
- Construction Management
Best Practices Resources
TR-210-60 Earth Dams and Reservoirs, NRCS
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR
Federal Guidelines for Dam Safety (FEMA P-93), FEMA
Arch Dam Design (EM 1110-2-2201), USACE
Gravity Dam Design (EM 1110-2-2200), USACE
Trainings
On-Demand Webinar: Field Investigations for New and Existing Dams