New Dams: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
(19 intermediate revisions by 3 users not shown) | |||
Line 1: | Line 1: | ||
__NOTOC__ | __NOTOC__ | ||
[[Category:Engineering]] | [[Category: Engineering]] | ||
---- | ---- | ||
{{Picture | |||
<!-- Add image file name (ex.image.jpg) --> | |||
|image= ShastaDam.jpg | |||
<!--Add link if applicable --> | |||
|link= | |||
<!-- Add picture caption --> | |||
|caption= Construction of the Shasta Dam in California between 1938 and 1945. | |||
(Image Source: Library of Congress Prints and Photographs Division) | |||
}} | |||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
[ | The planning, design, and [[construction]] of a new dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to: | ||
* Legal Agreements | |||
[ | * [[Permitting]] | ||
* Public Outreach | |||
* [[Hazard Potential Classification]] | |||
* Water Demand / Population Studies | |||
* Benefit-Cost Analyses | |||
* [[Hydrology | Hydrologic]] Studies | |||
* [[Environmental]] Impact Studies | |||
* [[Sedimentation| Reservoir Sedimentation Analyses]] | |||
* [[Geotechnical Exploration | Preliminary Site Investigations]] | |||
* [[Geotechnical and Geology | Geologic and Geotechnical]] Investigations | |||
* [[Seismic]] Investigations | |||
* [[Structural]] / Embankment Design | |||
* [[Hydraulics | Hydraulic]] Design | |||
* Creation of an [[Operation & Maintenance | Operation and Maintenance]] Program | |||
* [[Risk Management for Dam Safety | Risk Communication]] | |||
* [[Construction]] Management | |||
==Best Practices Resources== | ==Best Practices Resources== | ||
{{Document Icon}} | {{Document Icon}} [[Technical Release 210-60: Earth Dams and Reservoirs | TR-210-60 Earth Dams and Reservoirs, NRCS]] | ||
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards) | Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR]] | |||
{{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA]] | |||
{{Document Icon}} [[Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333) | Federal Guidelines for Dam Safety: Hazard Potential Classification System for Dams (FEMA P-333), FEMA]] | |||
{{Document Icon}} [[Arch Dam Design (EM 1110-2-2201) | Arch Dam Design (EM 1110-2-2201), USACE]] | |||
{{Document Icon}} [[Gravity Dam Design (EM 1110-2-2200) | Gravity Dam Design (EM 1110-2-2200), USACE]] | |||
==Trainings== | ==Trainings== | ||
{{Video Icon}} | {{Video Icon}} [[On-Demand Webinar: Field Investigations for New and Existing Dams]] | ||
{{Video Icon}} [[On-Demand Webinar: Risk Assessment Basics for an Individual Dam]] | |||
<!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> | <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> |
Latest revision as of 04:23, 21 July 2023
Construction of the Shasta Dam in California between 1938 and 1945.
(Image Source: Library of Congress Prints and Photographs Division) |
The planning, design, and construction of a new dam requires many different tasks involving a variety of disciplines. Common tasks include but are not limited to:
- Legal Agreements
- Permitting
- Public Outreach
- Hazard Potential Classification
- Water Demand / Population Studies
- Benefit-Cost Analyses
- Hydrologic Studies
- Environmental Impact Studies
- Reservoir Sedimentation Analyses
- Preliminary Site Investigations
- Geologic and Geotechnical Investigations
- Seismic Investigations
- Structural / Embankment Design
- Hydraulic Design
- Creation of an Operation and Maintenance Program
- Risk Communication
- Construction Management
Best Practices Resources
TR-210-60 Earth Dams and Reservoirs, NRCS
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR
Federal Guidelines for Dam Safety (FEMA P-93), FEMA
Arch Dam Design (EM 1110-2-2201), USACE
Gravity Dam Design (EM 1110-2-2200), USACE
Trainings
On-Demand Webinar: Field Investigations for New and Existing Dams
On-Demand Webinar: Risk Assessment Basics for an Individual Dam
Citations:
Revision ID: 7357
Revision Date: 07/21/2023