ASDSO Dam Safety Toolbox

Stability During Steady State Seepage Conditions

From ASDSO Dam Safety Toolbox
Revision as of 02:04, 3 August 2023 by [email protected] (talk | contribs) (Created page with ""Long-term stability computations are performed for conditions that will exist a sufficient length of time after construction for steady-state seepage or hydrostatic conditions to develop. (Hydrostatic conditions are a special case of steady-state seepage, in which there is no flow.) Stability computations are performed using shear strengths expressed in terms of effective stresses, with pore pressures appropriate for the long-term condition." <ref> https://www.p...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

"Long-term stability computations are performed for conditions that will exist a sufficient length of time after construction for steady-state seepage or hydrostatic conditions to develop. (Hydrostatic conditions are a special case of steady-state seepage, in which there is no flow.) Stability computations are performed using shear strengths expressed in terms of effective stresses, with pore pressures appropriate for the long-term condition." [1]


Citations: