ASDSO Dam Safety Toolbox

Foundation Protection & Preparation

From ASDSO Dam Safety Toolbox
Revision as of 21:41, 15 March 2023 by Grichards (talk | contribs) (Created page with "<!-- Default code to remove table of contents and add line break at top of page --> __NOTOC__ <!-- Add Category to drive breadcrumb menus --> Category: Construction ---- <!-- Insert image using {{Picture}} template --> {{Picture <!-- Add image file name (ex.image.jpg) --> |image= foundation prep.jpg <!--Add link if applicable --> |link= <!-- Add picture caption --> |caption= Foundation of Chimney Hollow Dam (CO DWR). }} <!-- Introductory paragraph or topic page sum...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Foundation of Chimney Hollow Dam (CO DWR).

Regardless of dam type, the interface between the dam and its foundation is critical to the design and construction of a dam. During construction, foundations should be cleaned, protected and prepared appropriately.


Citations:



Revision ID: 6639
Revision Date: 03/15/2023