Initial Reservoir Filling and Surveillance Record
From ASDSO Dam Safety Toolbox
"An initial reservoir filling and surveillance plan should be prepared by the design staff. Initial filling should be well documented, including a record of reservoir elevations and controlled water releases during the filling. The record should include complete written justification and design approval of any deviations from the planned filling. The surveillance record should include all information obtained from inspection of the dam, appurtenant structures, abutments, and reservoir rim during the initial filling." [1]
Citations:
Revision ID: 4912
Revision Date: 12/05/2022