ASDSO Dam Safety Toolbox

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 7- Construction Quality Control Inspection Program

From ASDSO Dam Safety Toolbox
Revision as of 21:00, 8 August 2022 by Camrenbt (talk | contribs) (Created page with "{{References Template |author= <!-- Add author/publisher below--> Federal Energy Regulatory Commission |date= <!-- Add publication year --> 1993 |picture= <!--create a file below in format File:example.png, then add picture to that file--> File:CH7.jpg |link= <!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> https://3.238.206.13/images/8/86/CH7.pdf |abstract= <!-- Add document summary-->...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Federal Energy Regulatory Commission, 1993



The guidelines presented in this chapter provide staff engineers and geologists with recommended procedures and criteria to be used in reviewing and evaluating construction quality control inspection programs for FERC jurisdictional projects. These guidelines are based on the FERC Regulations, FERC Operating Manual for Inspection of Projects and Supervision of Licenses for Water Power Projects, and selected Quality Control Inspection Programs (QCIPs) from each FERC Regional Office. The term "licensee" in the remainder of this chapter refers to licensee, exemptee or applicant as appropriate. The review performed by staff will be conducted to ensure that submitted QCIPs comply with the Commission's Regulations and provide accepted construction quality control inspection and documentation practices common to the hydroelectric industry. Quality control has been defined as measuring conformance with the requirements. In addition it is deciding what will be measured and who will do the measuring and documentation.


Document Download:

1993 (current)


Errata/Special Notes:

None



Revision ID: 2130
Revision Date: 08/08/2022