ASDSO Dam Safety Toolbox

All public logs

Jump to: navigation, search

Combined display of all available logs of ASDSO Dam Safety Toolbox. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs
  • 16:17, 24 June 2022 Camrenbt talk contribs created page Replacement (Created page with "Conduit replacement is achieved by excavating the embankment, removing the existing conduit, and replacing with a new conduit. Common replacement pipe material types include Corrugated Metal Pipe, Concrete Pipe, and Plastic Pipe. Several important questions to ask include: #Is the existing means of control adequate? Is the gate / valve in a good condition, location, with no operational problems? If not, an evaluation of outlet configurations should be first. #The next ch...")