ASDSO Dam Safety Toolbox

Underwater Construction

From ASDSO Dam Safety Toolbox
Revision as of 20:28, 27 June 2022 by Camrenbt (talk | contribs) (Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Divers may be required to complete construction.'' </div> ----</br> <!-- Add body paragraphs here --> At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. The Willow Creek dam is an earthen dam constructed in 1966 that impounds a...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Message: Divers may be required to complete construction.



At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required.

The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks:

  • Install 20' pipe segment with blind flange.
  • Reline existing outlet works with steel pipe and replace 2 existing valves in the dry.
  • Add new hydraulically operated gate valve.
  • Install trash rack and run hydraulic lines.


Revision ID: 1686
Revision Date: 06/27/2022