ASDSO Dam Safety Toolbox

Upstream Control with Multiple Gates

From ASDSO Dam Safety Toolbox
Revision as of 19:21, 24 June 2022 by Camrenbt (talk | contribs) (Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Dual gates allow work to be done on the operating gate without draining the reservoir.'' </div> ----</br> <!-- Add body paragraphs here --> The southwestern Montana ski resort dam uses a dual gate system. One gate is used for operation (downstream), while the other gate is used for emergencies (upstream). Emergency gates are important safeguards, allowing work to be done on the op...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Message: Dual gates allow work to be done on the operating gate without draining the reservoir.



The southwestern Montana ski resort dam uses a dual gate system. One gate is used for operation (downstream), while the other gate is used for emergencies (upstream). Emergency gates are important safeguards, allowing work to be done on the operating gate without draining the reservoir.


Revision ID: 1487
Revision Date: 06/24/2022