ASDSO Dam Safety Toolbox

CIPP Example 2

From ASDSO Dam Safety Toolbox
Revision as of 22:32, 23 June 2022 by Camrenbt (talk | contribs) (Created page with "<div style= "text-align:center;">''Message: CIPP can work well for slightly deformed pipes''</div> ----</br> Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necess...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search
Message: CIPP can work well for slightly deformed pipes


Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.


Revision ID: 1364
Revision Date: 06/23/2022