ASDSO Dam Safety Toolbox

Initial Reservoir Filling and Surveillance Record: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
 
Line 2: Line 2:
[[Category:Record Keeping]]   
[[Category:Record Keeping]]   
----  
----  
"An initial reservoir filling and surveillance plan should be prepared by the design staff. Initial filling should be well documented, including a record of reservoir elevations and controlled water releases during the filling. The record should include complete written justification and design approval of any deviations from the planned filling. The surveillance record should include all information obtained from inspection of the dam, appurtenant structures, abutments, and reservoir rim during the initial filling." <ref name="FEMA P93">[[Federal Guidelines for Dam Safety (FEMA P-93)| Federal Guidelines for Dam Safety (FEMA P-93) (FEMA, 2004)]]</ref>
"An initial reservoir filling and surveillance plan should be prepared by the design staff. Initial filling should be well documented, including a record of reservoir elevations and controlled water releases during the filling. The record should include complete written justification and design approval of any deviations from the planned filling. The surveillance record should include all information obtained from inspection of the dam, appurtenant structures, abutments, and reservoir rim during the initial filling." <ref name="FEMA P93">[[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA, 2004]]</ref>


<!-- In the location of an in text citation, simply enclose the citation as follows: <ref> citation </ref>. Citations will automatically populate. Learn more at https://www.mediawiki.org/wiki/Help:Cite.  -->  
<!-- In the location of an in text citation, simply enclose the citation as follows: <ref> citation </ref>. Citations will automatically populate. Learn more at https://www.mediawiki.org/wiki/Help:Cite.  -->  

Latest revision as of 14:14, 14 December 2022


"An initial reservoir filling and surveillance plan should be prepared by the design staff. Initial filling should be well documented, including a record of reservoir elevations and controlled water releases during the filling. The record should include complete written justification and design approval of any deviations from the planned filling. The surveillance record should include all information obtained from inspection of the dam, appurtenant structures, abutments, and reservoir rim during the initial filling." [1]


Citations:


Revision ID: 5612
Revision Date: 12/14/2022