New Dams: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) No edit summary |
Rmanwaring (talk | contribs) No edit summary |
||
Line 24: | Line 24: | ||
* [[Reservoirs | Reservoir]] [[sedimentation]] analyses | * [[Reservoirs | Reservoir]] [[sedimentation]] analyses | ||
* Preliminary site investigations | * Preliminary site investigations | ||
* Geologic and | * [[Geotechnical and Geology | Geologic and geotechnical]] investigations | ||
* [[Seismic]] investigations | * [[Seismic]] investigations | ||
* Creation of an [[operation]] | * [[Structural]] / embankment design | ||
* [[Hydraulics | Hydraulic]] design | |||
* Creation of an [[Operation & Maintenance | operation and maintenance]] program | |||
==Best Practices Resources== | ==Best Practices Resources== |
Revision as of 20:48, 7 December 2022
Construction of the Shasta Dam in California between 1938 and 1945. |
The planning, design, and construction of a new dam requires many different tasks involving a variety of disciplines and include but are not limited to:
- Legal agreements
- Permitting
- Public outreach / risk communication
- Hazard Potential classification
- Water demand / population studies
- Benefit-cost analyses
- Hydrologic studies
- Environmental impact studies
- Reservoir sedimentation analyses
- Preliminary site investigations
- Geologic and geotechnical investigations
- Seismic investigations
- Structural / embankment design
- Hydraulic design
- Creation of an operation and maintenance program
Best Practices Resources
Catalog of FEMA National Dam Safety Program Resources (FEMA P-732), FEMA, 2021
TR-210-60 Earth Dams and Reservoirs, NRCS, 2019
Design Standards No. 13: Embankment Dams (Ch. 1: General Design Standards), USBR, 2011
Federal Guidelines for Dam Safety, FEMA, 2004
Trainings
On-Demand Webinar: Field Investigations for New and Existing Dams
On-Demand Webinar: Risk Assessment Basics for an Individual Dam
Citations:
Revision ID: 5039
Revision Date: 12/07/2022