Design and Construction of Principal Spillways: Difference between revisions
From ASDSO Dam Safety Toolbox
Rmanwaring (talk | contribs) No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
__NOTOC__ | __NOTOC__ | ||
[[Category:Principal Spillways]] | |||
---- | ---- | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> |
Revision as of 06:50, 18 November 2022
[Paragraph here]
See also: Design and Construction of Outlet Works
Examples
Learn about the vulnerabilities of concrete lined spillways at DamFailures.org
Best Practices Resources
Technical Release 210-60: Earth Dams and Reservoirs (Natural Resources Conservation Service)
Hydraulic Design of Spillways (EM 1110-2-1603) (U.S. Army Corps of Engineers)
Design of Small Dams (Bureau of Reclamation)
Trainings
On-Demand Webinar: Inspection and Assessment of Spillways
On-Demand Webinar: Inlet and Outlet Hydraulics for Spillways and Outlet Structures
Citations:
Revision ID: 4542
Revision Date: 11/18/2022