ASDSO Dam Safety Toolbox

HDPE Encased in Concrete: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "<div style= "text-align:center;">''Message: HDPE pipe should be encased in concrete.''</div> ----</br> The CMP outlet in this Washington State Dam was replaced with HDPE pipe. The pipe was encased in concrete to ensure quality compaction against the conduit. <gallery mode="slideshow"> File:HEI1.jpg|Placing concrete forms around HDPE pipe. File:HEI2.jpg|HDPE pipe after concrete encasement. </gallery> Category:Example Pages {{Revhistinf}}")
 
No edit summary
Line 10: Line 10:
</gallery>
</gallery>


''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.''
[[Category:Example Pages]]
[[Category:Example Pages]]
{{Revhistinf}}
{{Revhistinf}}

Revision as of 20:46, 15 September 2022

Message: HDPE pipe should be encased in concrete.


The CMP outlet in this Washington State Dam was replaced with HDPE pipe. The pipe was encased in concrete to ensure quality compaction against the conduit.


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 3177
Revision Date: 09/15/2022