CIPP Example 2: Difference between revisions
From ASDSO Dam Safety Toolbox
(Created page with "<div style= "text-align:center;">''Message: CIPP can work well for slightly deformed pipes''</div> ----</br> Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necess...") |
No edit summary |
||
Line 13: | Line 13: | ||
File:2CE7.jpg|Inserting liner into pipe | File:2CE7.jpg|Inserting liner into pipe | ||
''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.'' | |||
</gallery> | </gallery> | ||
[[Category:Example Pages]] | [[Category:Example Pages]] | ||
{{Revhistinf}} | {{Revhistinf}} |
Revision as of 20:03, 15 September 2022
Message: CIPP can work well for slightly deformed pipes
Cured in place pipe was chosen as the rehabilitation alternative for this Powell County Dam for many reasons: 1) the dam was 45 feet high, so pipe replacement would have been a major effort; 2) although the host CMP pipe was beginning to deteriorate, it did not have visible holes; 3) the host CMP pipe was slightly deformed into an oblong shape, thus it was necessary to choose a “form fitting” liner like CIPP.