Design and Construction of Principal Spillways: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
See also: [[Design and Construction of Outlet Works]] | See also: [[Anatomy of Dams]] > [[Water Conveyance]] > [[Outlet Works]] > [[Design and Construction of Outlet Works]] | ||
==Examples== | ==Examples== |
Latest revision as of 23:22, 16 March 2023
See also: Anatomy of Dams > Water Conveyance > Outlet Works > Design and Construction of Outlet Works
Examples
Learn about the vulnerabilities of concrete lined spillways at DamFailures.org
Best Practices Resources
Technical Release 210-60: Earth Dams and Reservoirs (Natural Resources Conservation Service)
Hydraulic Design of Spillways (EM 1110-2-1603) (U.S. Army Corps of Engineers)
Design of Small Dams (Bureau of Reclamation)
Trainings
On-Demand Webinar: Inspection and Assessment of Spillways
On-Demand Webinar: Inlet and Outlet Hydraulics for Spillways and Outlet Structures
Citations:
Revision ID: 6675
Revision Date: 03/16/2023