Operation: Difference between revisions
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
*[[Use a Limit Nut on Gates]] | *[[Use a Limit Nut on Gates]] | ||
''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.'' | |||
[[Category:Example Pages]] | [[Category:Example Pages]] | ||
{{Revhistinf}} | {{Revhistinf}} |
Revision as of 19:53, 15 September 2022
Before embarking on an outlet works rehabilitation, it is important to assess the condition of your gates and other controls used to make releases. Questions to ask include:
Access: Is the gate easy to access in all conditions? If not, consider a new configuration with ready access.
Operation: Does the gate operate smoothly or bind? If it binds, careful examination of the entire system is in order.
Debris: Does the dam have a history of debris getting stuck in the gate or intake structure? If so, attention to the trash rack is needed, or possibly a new configuration less susceptible to clogging.
Venting: Is the conduit pitting and deteriorating downstream of the gate? Additional airflow may be needed.
Configuration: Is having to drain the reservoir to work on the gate completely unacceptable? If so, having a dual gate system may be in order.
Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 3149
Revision Date: 09/15/2022