Abandonment Example 1: Difference between revisions
(Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: It may not be possible to rehabilitate severely deteriorated pipes.'' </div> ----</br> <!-- Add body paragraphs here --> In this Alaska dam, the principal outlet conduit was in need of rehabilitation. The pipe was a good candidate for sliplining and the condition of the pipe allowed for a successful rehabilitation. However, the dam also had an auxiliary overflow conduit that was...") |
No edit summary |
||
Line 20: | Line 20: | ||
</gallery> | </gallery> | ||
''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.'' | |||
[[Category:Example Pages]] | [[Category:Example Pages]] | ||
{{Revhistinf}} | {{Revhistinf}} |
Revision as of 20:47, 15 September 2022
Message: It may not be possible to rehabilitate severely deteriorated pipes.
In this Alaska dam, the principal outlet conduit was in need of rehabilitation. The pipe was a good candidate for sliplining and the condition of the pipe allowed for a successful rehabilitation.
However, the dam also had an auxiliary overflow conduit that was in need of rehabilitation. As shown in the images below, the pipe was in poor condition and sliplining was not an option. Ultimately, the auxiliary overflow conduit could not be rehabilitated and the pipe was abandoned in place using a cellular grout.
Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.