Plunge Basin Examples: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
m (Camrenbt moved page Plunge Basins to Plunge Basin Examples) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
File:typical plan.jpg|Plan view of a typical lined plunge basin design. | File:typical plan.jpg|Plan view of a typical lined plunge basin design. | ||
File:elevation plan.jpg|Elevation view of a typical lined plunge basin design. | File:elevation plan.jpg|Elevation view of a typical lined plunge basin design. | ||
File:jet trajectory.jpg|Jet trajectory from a 54-inch diameter hooded fixed-cone valve. | |||
</gallery> | </gallery> | ||
[[Category:Story Pages]] | |||
[[ | {{Revhistinf}} |
Latest revision as of 16:56, 27 June 2022
When the erosion anticipated downstream of the outlet works is minimal and/or manageable, a plunge basin (pool) is commonly used as the energy dissipator. Plunge basins may be lined or unlined. The discharge into the basin may come from a free outlet or from a valve. The following pictures are examples of plunge basins:
Revision ID: 1577
Revision Date: 06/27/2022