ASDSO Dam Safety Toolbox

Foundation Protection & Preparation: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "<!-- Default code to remove table of contents and add line break at top of page --> __NOTOC__ <!-- Add Category to drive breadcrumb menus --> Category: Construction ---- <!-- Insert image using {{Picture}} template --> {{Picture <!-- Add image file name (ex.image.jpg) --> |image= foundation prep.jpg <!--Add link if applicable --> |link= <!-- Add picture caption --> |caption= Foundation of Chimney Hollow Dam (CO DWR). }} <!-- Introductory paragraph or topic page sum...")
 
No edit summary
 
Line 12: Line 12:
|link=
|link=
<!-- Add picture caption -->
<!-- Add picture caption -->
|caption= Foundation of Chimney Hollow Dam (CO DWR).
|caption= Foundation of Chimney Hollow Dam.
(Image Source: CO DWR)
}}
}}



Latest revision as of 16:01, 21 July 2023


Foundation of Chimney Hollow Dam.

(Image Source: CO DWR)

Regardless of dam type, the interface between the dam and its foundation is critical to the design and construction of a dam. During construction, foundations should be cleaned, protected and prepared appropriately.


Citations:



Revision ID: 7385
Revision Date: 07/21/2023