ASDSO Dam Safety Toolbox

Engineer/Construction Manager: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
No edit summary
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 11: Line 11:
<!-- Add picture caption -->  
<!-- Add picture caption -->  
|caption= Construction of the Hungry Horse Dam in Montana.
|caption= Construction of the Hungry Horse Dam in Montana.
(Image Source: [https://commons.wikimedia.org/wiki/File:Hungry_Horse_Dam_under_construction_2_-_9-15-1951.jpg Wikimedia])
}}  
}}  


<!-- Introductory paragraph or topic page summary -->  
<!-- Introductory paragraph or topic page summary -->  
"The design function can never be considered finished as long as the dam remains in place; design involvement should continue throughout [[construction]] and [[operation]] of the project. The design office should establish specific programs for onsite construction and operational inspection for review by appropriate design personnel and technical specialists. The programs should include frequent and mandatory [[inspections]] during construction to confirm that site conditions conform to those assumed for design or to determine if design changes may be required to suit the actual conditions. A major requirement is inspection and approval of the dam foundation and foundation treatment before placing of dam materials. Final design inspection of the construction should include complete project surveillance and testing of operating equipment. Operational design inspections should continue throughout the life of the project, in accordance with a formal inspection program covering all project features. Management must program adequate funds to assure dam safety is not compromised by failure to conduct regular and thorough inspections and reviews."<ref name="FGDS">[[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA, 2004]]</ref>
"[[Construction]] engineers need to be aware of design philosophies and assumptions as to site conditions and function of project structures, and must understand the designers' intent concerning special technical provisions in the [[specifications]]. Identified preconstruction activities should include the orientation of construction engineers to the site specificity of the design and to the close communication requirements with all concerned [[engineering]] disciplines during the construction process. For major projects, there should be periodic meetings between design and construction engineers to discuss upcoming construction activities. Also, during the initial stages of important construction activities, the construction engineers should request site inspection by the design engineers to assure construction procedures are in accordance with design requirements." <ref name="FGDS">[[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA, 2004]]</ref>


"The design function includes responsibility for planning any dam instrumentation to be installed during construction and/or operation to monitor conditions that could potentially threaten dam safety. The design should identify the purpose of the instrumentation, and include the plans for timely reading, collecting, reducing, and interpreting the data. It should include an advance determination of critical instrument observations or rates of data change, and a plan of action if observations indicate a critical condition may occur."<ref name="FGDS"/>
"The programs should include frequent and mandatory [[inspections]] during construction to confirm that site conditions conform to those assumed for design or to determine if design changes may be required to suit the actual conditions. A major requirement is inspection and approval of the dam foundation and foundation treatment before placing of dam materials. Final design inspection of the construction should include complete project surveillance and testing of operating equipment."<ref name="FGDS"/>


==[[Best Practices Resources]]==
==Best Practices Resources==
{{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA, 2004]]
{{Document Icon}} [[Federal Guidelines for Dam Safety (FEMA P-93) | Federal Guidelines for Dam Safety (FEMA P-93), FEMA]]


==Trainings==
==Trainings==

Latest revision as of 15:33, 21 July 2023


Construction of the Hungry Horse Dam in Montana.

(Image Source: Wikimedia)

"Construction engineers need to be aware of design philosophies and assumptions as to site conditions and function of project structures, and must understand the designers' intent concerning special technical provisions in the specifications. Identified preconstruction activities should include the orientation of construction engineers to the site specificity of the design and to the close communication requirements with all concerned engineering disciplines during the construction process. For major projects, there should be periodic meetings between design and construction engineers to discuss upcoming construction activities. Also, during the initial stages of important construction activities, the construction engineers should request site inspection by the design engineers to assure construction procedures are in accordance with design requirements." [1]

"The programs should include frequent and mandatory inspections during construction to confirm that site conditions conform to those assumed for design or to determine if design changes may be required to suit the actual conditions. A major requirement is inspection and approval of the dam foundation and foundation treatment before placing of dam materials. Final design inspection of the construction should include complete project surveillance and testing of operating equipment."[1]

Best Practices Resources

Federal Guidelines for Dam Safety (FEMA P-93), FEMA

Trainings

On-Demand Webinar: Fundamentals of Concrete Construction Inspections for Dams and Appurtenant Structures

On-Demand Webinar: Managing Increased Dam Safety Risk During Reconstruction

On-Demand Webinar: Quality Assurance and Field Inspection for Dam Construction Projects


Citations:


Revision ID: 7383
Revision Date: 07/21/2023