Active seepage situation at the toe of a dam. ([https://damfailures.org/lessons-learned/uncontrolled-vegetation-on-and-around-dams-can-hinder-inspection-and-lead-to-serious-structural-damage-significant-maintenance-costs-and-possible-failure/ DamFailures.org])
Active seepage situation at the toe of a dam.  
(Image Source: [https://damfailures.org/lessons-learned/uncontrolled-vegetation-on-and-around-dams-can-hinder-inspection-and-lead-to-serious-structural-damage-significant-maintenance-costs-and-possible-failure/ DamFailures.org])
}}
}}


Nearly every dam experiences seepage to varying degrees. Depending on the type of dam and its unique site conditions, seepage may go through, underneath, or around the dam. When left unchecked, excessive seepage can lead to problems such as internal erosion and eventual failure of either the dam itself or other vital components of the dam. According to the Association of State Dam Safety Officials (ASDSO), the second most common dam failure incident driver between the years 2010 through 2019 were seepage or internal erosion.<ref name="ASDSO">[https://damsafety.org/dam-failures Dam Failures and Incidents, ASDSO, 2022]</ref>  
Nearly every dam experiences seepage to varying degrees. Depending on the type of dam and its unique site conditions, seepage may go through, underneath, or around the dam. When left unchecked, excessive seepage can lead to problems such as internal erosion and eventual failure of either the dam itself or other vital components of the dam. According to the Association of State Dam Safety Officials (ASDSO), the second most common dam failure incident driver between the years 2010 through 2019 was seepage or internal erosion.<ref name="ASDSO">[https://damsafety.org/dam-failures Dam Failures and Incidents, ASDSO, 2022]</ref>  


As a result, monitoring the level of seepage experienced by a dam is essential to building a performance history of the dam season to season and year to year against which future observations can be compared. Should anomalies in the real-time seepage data occur, having a well-documented history can help operators, owners, and engineers to determine the cause in these anomalies and recognize if they are cause for concern.  
As a result, monitoring the level of seepage experienced by a dam is essential to building a performance history of the dam season to season and year to year against which future observations can be compared. Should anomalies in the real-time seepage data occur, having a well-documented history can help operators, owners, and engineers determine the cause of these anomalies and if they are cause for concern.  


“If uncontrolled seepage is observed, then it should be monitored. To monitor seepage, the following should be recorded: the location of all seepage exit points; seepage flow rates and clarity; the occurrence of recent [[precipitation]] that could account for what appears to be seepage, or that could affect the appearance and quantity of actual seepage; the level of the reservoir at the time of the observation. Notes, sketches, and photographs are useful in documenting and evaluating seepage conditions. The amount of seepage usually correlates with the level of the reservoir. Generally, as the level of the reservoir rises, the seepage flow rate increases. An increase in a seepage flow rate for a similar reservoir elevation is cause for concern. In some cases, dye can be used to confirm that the reservoir is the source of seepage. A dye test is not a routing procedure. The length of time it takes to conduct a test may vary since the dye may take different amounts of time to penetrate the embankment or foundation. In most cases, records of seepage volumes that correlate with reservoir elevations are needed to show that seepage comes from the reservoir”.<ref name="IED">[[Inspection of Embankment Dams | Inspection of Embankment Dams, USBR]]</ref>  
“If uncontrolled seepage is observed, then it should be monitored. To monitor seepage, the following should be recorded: the location of all seepage exit points; seepage flow rates and clarity; the occurrence of recent [[precipitation]] that could account for what appears to be seepage, or that could affect the appearance and quantity of actual seepage; the level of the reservoir at the time of the observation. Notes, sketches, and photographs are useful in documenting and evaluating seepage conditions. The amount of seepage usually correlates with the level of the reservoir. Generally, as the level of the reservoir rises, the seepage flow rate increases. An increase in a seepage flow rate for a similar reservoir elevation is cause for concern. In some cases, dye can be used to confirm that the reservoir is the source of seepage. A dye test is not a routing procedure. The length of time it takes to conduct a test may vary since the dye may take different amounts of time to penetrate the embankment or foundation. In most cases, records of seepage volumes that correlate with reservoir elevations are needed to show that seepage comes from the reservoir”.<ref name="IED">[[Inspection of Embankment Dams | Inspection of Embankment Dams, USBR]]</ref>  
Line 24: Line 25:


==Measurement Devices==
==Measurement Devices==
*[[Weirs]]
*[[Weirs]]
*[[Flumes]]
*[[Piezometers]]
*[[Piezometers]]
:“Applications for piezometers fall into two general categories – to monitor the pattern of water flow and to provide an index of soil strength. (a) Examples in the first category include determining [[groundwater]] conditions before [[construction]], monitoring seepage pressure distribution, and determining the effectiveness of drains, [[relief wells]], and seepage barriers. (b) In the second category, measuring porewater pressure permits an estimation of effective stress and soil strength. Examples include monitoring the dissipation of porewater pressure during consolidation of a foundation and embankment fill or following the rapid drawdown of a reservoir pool”.<ref name="EM 1110-2-1908" />
*[[Relief Wells]]
*[[Relief Wells]]
:“Relief wells are typically vertical drains placed to relieve uplift pressure at the downstream toe of an embankment. Piezometers are typically located equidistant between two wells. Under maximum hydraulic load, the piezometric level at the downstream toe of an embankment should be lower than the ground surface”.<ref name="EM 1110-2-1908" />
*[[Embankment Drains]]
*[[Embankment Drains]]
:“A simple method of measuring the flow from a toe drain outfall is to catch the flow from the pipe in a container of known volume and to time how long it takes to fill the container. The flow rate is usually recorded in gallons per minute. Compare the amount of flow with the amount of flow anticipated for the current [[Reservoir Level|reservoir level]] based on previous readings. A drain that has no flow at all could simply mean that there is no seepage in the area of the dam serviced by the drain. However, an absence of flow could also indicate a problem. If a drain has never functioned, it could mean that the drain was designed or installed incorrectly. If it flowed at one time but has now stopped flowing, it may have become plugged. A plugged drain can be a serious problem because seepage may begin to exit down slope, or may [[contribute]] to internal pressure and instability. If possible, blocked drains should be cleaned so that the controlled release of seepage may be restored. Decreasing amounts of flow from a drain for the same [[Reservoir Level|reservoir level]] may indicate that the drain is becoming clogged. Conversely, a sudden increase in drain flow may indicate that the core is becoming less watertight, possibly as the result of transverse cracking. Recording drain flow rates and reservoir levels over time will help in assessing a dam’s seepage conditions”.<ref name="IED">[[Inspection of Embankment Dams | Inspection of Embankment Dams, USBR]]</ref>
*[[Concrete Structure Drains]]
*[[Concrete Structure Drains]]
*[[Turbidity (Migration of Fines)]]
*[[Turbidity (Migration of Fines)]]
 
*[[Visual Surveillance & Monitoring]]
:“Weirs are preferred to flumes for measuring flow in small open channels at embankments because a weir traps sediment and debris possibly produced by internal erosion, increasing the likelihood the sediment is noticed”.<ref name="EM 1110-2-1908" />
 
*[[Visual Observation (Seepage)]]
 
:“A visual inspection is hands-on and requires careful and close examination. The inspector should look closely at the members of connections and not just view them from a distance. Inspectors should use various measuring scales, and other hand tool to identify, measure, and locate areas of concerns. Boroscopes, flashlights, and mirrors bay be necessary to inspect areas of limited visibility. Weld gauges should be available to check the dimensions of weld beads. Critical areas should be cleaned prior to inspection, and additional lighting should be used when necessary”.<ref name="IERHSS">[[Inspection, Evaluation, and Repair of Hydraulic Steel Structures | Inspection, Evaluation, and Repair of Hydraulic Steel Structures, USACE, 2001]]</ref>
 
:“It is important to look at the entire surface area of an embankment. The general technique is to walk over the slopes and crest as many times as is necessary in order to see the entire surface area clearly. From a given point on the dam, small details can usually be seen for a distance of perhaps 10 to 30 feet (3 to 10 meters) in any direction, depending on the roughness of the surface, vegetation, or other surface conditions. Therefore, to ensure that the entire surface of a dam has been covered, several passes must be made. It is not really that important what approach is used, as long as it is systematic such that all of the surface area is covered.<ref name="IED" />
 
:“At regular intervals while walking the slope and crest of a dam, an inspector should stop and look around in all directions to: observe the surface from a different perspective, which sometimes reveals a deficiency that might otherwise go undetected; check the alignment of the surface. In addition, viewing the slope from a distance may also reveal a number of anomalies such as distortions of the embankment surfaces and subtle changes in vegetation. Often these types of observations are not apparent when viewing them close up.<ref name="IED" />
 
:“The areas where the embankment contacts the abutments (sometimes referred to as the groins) should be inspected carefully. Inspection of the groins is important because: these areas are susceptible to surface runoff erosion; seepage often appears along the groins because the embankment/abutment contacts are more susceptible to seepage. When checking the alignment of the crest of a straight-axis dam, as well as any berms on the upstream and downstream slopes, an inspector should center his/her eyes along each shoulder of the crest or berm and move from side to side in order to view this line from several angles.<ref name="IED" />
 
:“Some tools or techniques that are helpful in sighting are: binoculars and telephoto lens: the use of binoculars or a telephoto lens can help in observing misalignments because distances are foreshortened and distortions perpendicular to the line of sight become more apparent. Reference lines: the use of a reference line can also be of great assistance in sighting. Reference lines can be existing features such as guardrails, a row of posts, pavement stripes on a roadway on the crest of the dam, parapet walls, etc.<ref name="IED" />
 
:“The sighting techniques described above are also useful for detecting a change in the uniformity of embankment slopes. The contact between the reservoir waterline and the upstream slope should parallel the alignment of the dam axis. In other words, the reservoir waterline should be a straight line if the dam has a straight axis.<ref name="IED" />
 
:“The alignment of the slope at the waterline can be checked by standing at one end of the dam and sighting along the waterline. Non-linearity of the waterline may indicate erosion or movement of the slope.<ref name="IED" />


==Best Practices Resources==
==Best Practices Resources==

Latest revision as of 20:15, 18 July 2023


Active seepage situation at the toe of a dam.

(Image Source: DamFailures.org)

Nearly every dam experiences seepage to varying degrees. Depending on the type of dam and its unique site conditions, seepage may go through, underneath, or around the dam. When left unchecked, excessive seepage can lead to problems such as internal erosion and eventual failure of either the dam itself or other vital components of the dam. According to the Association of State Dam Safety Officials (ASDSO), the second most common dam failure incident driver between the years 2010 through 2019 was seepage or internal erosion.[1]

As a result, monitoring the level of seepage experienced by a dam is essential to building a performance history of the dam season to season and year to year against which future observations can be compared. Should anomalies in the real-time seepage data occur, having a well-documented history can help operators, owners, and engineers determine the cause of these anomalies and if they are cause for concern.

“If uncontrolled seepage is observed, then it should be monitored. To monitor seepage, the following should be recorded: the location of all seepage exit points; seepage flow rates and clarity; the occurrence of recent precipitation that could account for what appears to be seepage, or that could affect the appearance and quantity of actual seepage; the level of the reservoir at the time of the observation. Notes, sketches, and photographs are useful in documenting and evaluating seepage conditions. The amount of seepage usually correlates with the level of the reservoir. Generally, as the level of the reservoir rises, the seepage flow rate increases. An increase in a seepage flow rate for a similar reservoir elevation is cause for concern. In some cases, dye can be used to confirm that the reservoir is the source of seepage. A dye test is not a routing procedure. The length of time it takes to conduct a test may vary since the dye may take different amounts of time to penetrate the embankment or foundation. In most cases, records of seepage volumes that correlate with reservoir elevations are needed to show that seepage comes from the reservoir”.[2]

“Seepage collection and discharge systems, including structural drainage systems, must include access points. Construct these systems in a manner that permits inspection and cleanout of drainpipes. Collection systems should include sediment traps and seepage measurement devices such as weirs or flumes, unless excluding these features is justified in design documentation”.[3]

Measurement Devices

Best Practices Resources

Instrumentation of Embankment Dams and Levees (EM 1110-2-1908) (U.S. Army Corps of Engineers)

Evaluation and Monitoring of Seepage and Internal Erosion (Federal Emergency Management Agency)

Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 9- Instrumentation and Monitoring (Federal Energy Regulatory Commission)

Design Standards No. 13: Embankment Dams (Ch. 8: Seepage) (Bureau of Reclamation)

Trainings

On-Demand Webinar: Internal Erosion – Applying Erosion Mechanics From ICOLD Bulletin 164 In Internal Erosion Failure Mode Analyses

On-Demand Webinar: Relearning How to Look at Piezometric Data for Seepage Evaluation

On-Demand Webinar: Evaluation and Maintenance of Piezometers, Relief Wells, and Drains in Dams and Levees

On-Demand Webinar: Seepage Monitoring and Analysis of Embankment Dams

YouTube: Seepage Monitoring and Analysis of Embankment Dams