ASDSO Dam Safety Toolbox

Grouting: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> __NOTOC__ ---- {{Picture <!-- Add image file name (ex.image.jpg) --> |image= Grouting.jpg <!--Add link if applicable --> |link= <!-- Add picture caption --> |caption= Filling joints in a concrete bridge deck with grout }} <!-- Introductory paragraph or topic page summary --> "Grouting in civil works activities is performed as: (1) and element of permanent const...")
 
No edit summary
 
(9 intermediate revisions by 3 users not shown)
Line 1: Line 1:
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->  
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed -->  
__NOTOC__  
__NOTOC__  
[[Category:Underseepage]]
----  
----  
{{Picture  
{{Picture  
<!-- Add image file name (ex.image.jpg) -->  
<!-- Add image file name (ex.image.jpg) -->  
|image= Grouting.jpg
|image= GroutingOperations_RidgesBasinDam.png
<!--Add link if applicable -->  
<!--Add link if applicable -->  
|link=  
|link=  
<!-- Add picture caption -->  
<!-- Add picture caption -->  
|caption= Filling joints in a concrete bridge deck with grout
|caption= Figure 15.1.2-1 Overview of Grouting Operations at Ridges Basin Dam<ref name="DS13-15">[[Design Standards No. 13: Embankment Dams (Ch. 15: Foundation Grouting) | Design Standards No. 13: Embankment Dams (Ch. 15: Foundation Grouting), USBR, 2014]]</ref>
(Image Source: USACE)
}}  
}}  


<!-- Introductory paragraph or topic page summary -->  
<!-- Introductory paragraph or topic page summary -->  
"Grouting in civil works activities is performed as: (1) and element of permanent [[construction]], (2) a post-construction remedial treatment, or (3) an element of expedient construction or repair. Examples of permanent construction are curtain grouting in foundations for dams and ground stabilization of foundation materials for large buildings. Examples of post-construction remedial treatment include grouting voids under concrete structures and reducing leakage through dam foundations or abutments. Grouting is used for both temporary and permanent treatments. It should be considered in combination with other appropriate types of treatment for best results. Other types of treatment may include excavation, compaction, concrete cutoff walls, slurry trenches, impervious blankets, drainage blankets, and filter zones. Treatments also include [[relief wells]], drilled drains, sheet pile cutoff, dental concrete, drainage [[tunnels]] and galleries, underpinning, and [[structural]] foundations. Purposes of expedient grouting include repair of roadways, cofferdams, and [[stability]] and [[groundwater]] control during construction."<ref name="EM1110-2-3506">[[Grouting Technology (EM 1110-2-3506) | Grouting Technology (EM 1110-2-3506) (USACE, 2017)]]</ref>
"Grouting in civil works activities is performed as: (1) an element of permanent [[construction]], (2) a post-construction remedial treatment, or (3) an element of expedient construction or repair. Examples of permanent construction are curtain grouting in foundations for dams and ground stabilization of foundation materials for large buildings. Examples of post-construction remedial treatment include grouting voids under concrete structures and reducing leakage through dam foundations or abutments. Grouting is used for both temporary and permanent treatments. It should be considered in combination with other appropriate types of treatment for best results. Other types of treatment may include excavation, compaction, concrete [[cutoff]] walls, slurry trenches, impervious blankets, drainage blankets, and filter zones. Treatments also include [[Relief Wells|relief wells]], drilled drains, sheet pile cutoff, dental concrete, drainage [[tunnels]] and galleries, underpinning, and [[structural]] foundations. Purposes of expedient grouting include repair of roadways, cofferdams, and [[stability]] and [[groundwater]] control during construction."<ref name="EM1110-2-3506">[[Grouting Technology (EM 1110-2-3506) | Grouting Technology (EM 1110-2-3506), USACE, 2017]]</ref>


"Grouting is the process in injecting liquids, mixed suspensions, or semi-solid mixtures under pressure to achieve one or more desirable end results in terms of improving [[engineering]] properties. To accomplish this, the injected grout must eventually form either a gel or a solid within the treatment zone. Permeation grouting is the injection of high-mobility grouts (HMGs) into small voids within soil or rock masses, into small voids between these materials and an existing structure, and/or into small cracks or fractures within structures themselves. Void-filling grouting involves using low- (or limited) mobility grout (or grouting) (LMG) or other materials having properties suitable for effective filling of large voids. Compaction grouting is the injections of plastic, semi-solid mixtures to densify or displace deformable materials. In-situ modification or [[replacement]] includes specialized techniques such as a jet grouting or hydrofracture grouting... Depending on the specific application, grouting is used as either the primary or sole means of effecting property improvement, or it may be used in conjunction with other technologies and methods."<ref name="EM1110-2-3506"/>
"Grouting is the process in injecting liquids, mixed suspensions, or semi-solid mixtures under pressure to achieve one or more desirable end results in terms of improving [[engineering]] properties. To accomplish this, the injected grout must eventually form either a gel or a solid within the treatment zone. Permeation grouting is the injection of high-mobility grouts (HMGs) into small voids within soil or rock masses, into small voids between these materials and an existing structure, and/or into small cracks or fractures within structures themselves. Void-filling grouting involves using low- (or limited) mobility grout (or grouting) (LMG) or other materials having properties suitable for effective filling of large voids. Compaction grouting is the injections of plastic, semi-solid mixtures to densify or displace deformable materials. In-situ modification or [[replacement]] includes specialized techniques such as a jet grouting or hydrofracture grouting... Depending on the specific application, grouting is used as either the primary or sole means of effecting property improvement, or it may be used in conjunction with other technologies and methods."<ref name="EM1110-2-3506"/>
Line 18: Line 20:
"Grouting is commonly used to reduce permeability, which might be necessary for reducing rates of seepage or leakage through or into new or existing structures and foundations, reducing hydrostatic forces acting on structures, altering flow gradients or flow paths to achieve specific design objectives, inhibiting internal erosion of foundation and embankment materials, and/or controlling water for excavations as required to facilitate [[dewatering]] or excavation stability. In any critical hydraulic application, grouting is normally one of several lines of defense."<ref name="EM1110-2-3506"/>
"Grouting is commonly used to reduce permeability, which might be necessary for reducing rates of seepage or leakage through or into new or existing structures and foundations, reducing hydrostatic forces acting on structures, altering flow gradients or flow paths to achieve specific design objectives, inhibiting internal erosion of foundation and embankment materials, and/or controlling water for excavations as required to facilitate [[dewatering]] or excavation stability. In any critical hydraulic application, grouting is normally one of several lines of defense."<ref name="EM1110-2-3506"/>


==Typical Applications of Grouting for Dams and Lock Structures<ref name="EM1110-2-3506"/>==  
==Typical Applications of Grouting for Dams and Lock Structures==  
* Hydraulic barrier grouting to control leakage and pressure distributions (i.e., grout curtain construction)
* "Hydraulic barrier grouting to control leakage and pressure distributions (i.e., grout curtain construction)
* Foundation consolidation grouting to reduce foundation and structure deformations under load
* "Foundation consolidation grouting to reduce foundation and structure deformations under load
* Contact grouting of the interface between structures and foundations
* "Contact grouting of the interface between structures and foundations
* Void filling in foundations beneath structures
* "Void filling in foundations beneath structures
* Compaction grouting for densification of loose deposits or jet grouting to replace zones of loose materials
* "Compaction grouting for densification of loose deposits or jet grouting to replace zones of loose materials
* Pre-treatment of fractures rock foundations to enable cutoff wall construction
* "Pre-treatment of fractures [[Rock Foundations|rock foundations]] to enable cutoff wall construction
* Grouting of leaking cracks or joints in structures
* "Grouting of leaking cracks or joints in structures
* [[Abandonment]] or backfilling of exploration and instrument holes
* "[[Abandonment]] or backfilling of exploration and instrument holes
* Improvement of zones as required to facilitate dewatering and/or excavation stability
* "Improvement of zones as required to facilitate dewatering and/or excavation stability<ref name="EM1110-2-3506"/>


==Examples==  
==<noautolinks>Best Practices Resources</noautolinks>==  
*  [[Link Name]]
{{Document Icon}} [[Design Standards No. 13: Embankment Dams (Ch. 15: Foundation Grouting) | Design Standards No. 13: Embankment Dams (Ch. 15: Foundation Grouting), USBR]]
{{Website Icon}} [[Page Name | Link Text]]
{{Document Icon}} [[Design of Small Dams | Design of Small Dams, USBR]]
{{Document Icon}} [[Page Name | Link Text (author)]]  
{{Video Icon}} [[Page Name | Link Text]]  


==[[Best Practices Resources]]==  
==<noautolinks>Trainings</noautolinks>==  
{{Document Icon}} [[Grouting Technology (EM 1110-2-3506) | Grouting Technology (EM 1110-2-3506) (USACE, 2017)]]
{{Video Icon}} [[On-Demand Webinar: Introduction to Grouting for Dams]]
 
==[[Trainings]]==


<!-- In the location of an in text citation, simply enclose the citation as follows: <ref> citation </ref>. Citations will automatically populate. Learn more at https://www.mediawiki.org/wiki/Help:Cite.  -->  
<!-- In the location of an in text citation, simply enclose the citation as follows: <ref> citation </ref>. Citations will automatically populate. Learn more at https://www.mediawiki.org/wiki/Help:Cite.  -->  

Latest revision as of 16:02, 18 July 2023


Figure 15.1.2-1 Overview of Grouting Operations at Ridges Basin Dam[1]

(Image Source: USACE)

"Grouting in civil works activities is performed as: (1) an element of permanent construction, (2) a post-construction remedial treatment, or (3) an element of expedient construction or repair. Examples of permanent construction are curtain grouting in foundations for dams and ground stabilization of foundation materials for large buildings. Examples of post-construction remedial treatment include grouting voids under concrete structures and reducing leakage through dam foundations or abutments. Grouting is used for both temporary and permanent treatments. It should be considered in combination with other appropriate types of treatment for best results. Other types of treatment may include excavation, compaction, concrete cutoff walls, slurry trenches, impervious blankets, drainage blankets, and filter zones. Treatments also include relief wells, drilled drains, sheet pile cutoff, dental concrete, drainage tunnels and galleries, underpinning, and structural foundations. Purposes of expedient grouting include repair of roadways, cofferdams, and stability and groundwater control during construction."[2]

"Grouting is the process in injecting liquids, mixed suspensions, or semi-solid mixtures under pressure to achieve one or more desirable end results in terms of improving engineering properties. To accomplish this, the injected grout must eventually form either a gel or a solid within the treatment zone. Permeation grouting is the injection of high-mobility grouts (HMGs) into small voids within soil or rock masses, into small voids between these materials and an existing structure, and/or into small cracks or fractures within structures themselves. Void-filling grouting involves using low- (or limited) mobility grout (or grouting) (LMG) or other materials having properties suitable for effective filling of large voids. Compaction grouting is the injections of plastic, semi-solid mixtures to densify or displace deformable materials. In-situ modification or replacement includes specialized techniques such as a jet grouting or hydrofracture grouting... Depending on the specific application, grouting is used as either the primary or sole means of effecting property improvement, or it may be used in conjunction with other technologies and methods."[2]

"Grouting is commonly used to reduce permeability, which might be necessary for reducing rates of seepage or leakage through or into new or existing structures and foundations, reducing hydrostatic forces acting on structures, altering flow gradients or flow paths to achieve specific design objectives, inhibiting internal erosion of foundation and embankment materials, and/or controlling water for excavations as required to facilitate dewatering or excavation stability. In any critical hydraulic application, grouting is normally one of several lines of defense."[2]

Typical Applications of Grouting for Dams and Lock Structures

  • "Hydraulic barrier grouting to control leakage and pressure distributions (i.e., grout curtain construction)
  • "Foundation consolidation grouting to reduce foundation and structure deformations under load
  • "Contact grouting of the interface between structures and foundations
  • "Void filling in foundations beneath structures
  • "Compaction grouting for densification of loose deposits or jet grouting to replace zones of loose materials
  • "Pre-treatment of fractures rock foundations to enable cutoff wall construction
  • "Grouting of leaking cracks or joints in structures
  • "Abandonment or backfilling of exploration and instrument holes
  • "Improvement of zones as required to facilitate dewatering and/or excavation stability[2]

Best Practices Resources

Design Standards No. 13: Embankment Dams (Ch. 15: Foundation Grouting), USBR

Design of Small Dams, USBR

Trainings

On-Demand Webinar: Introduction to Grouting for Dams


Citations: