Underwater Construction: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
[[Category:Construction Considerations Outlet Works]] | |||
---- | |||
''' ''Message: Divers may be required to complete [[construction]].'' ''' | |||
''Message: Divers may be required to complete construction.'' | |||
<!-- Add body paragraphs here --> | <!-- Add body paragraphs here --> | ||
At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. | At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required. | ||
The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks: | The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the [[Colorado]] River. A project was completed to rehabilitate the existing outlet works that included the following tasks: | ||
*Install 20' pipe segment with blind flange. | *Install 20' pipe segment with blind flange. |
Latest revision as of 03:33, 2 December 2022
Message: Divers may be required to complete construction.
At times, rehabilitating existing structures can present very difficult access and construction environments. Performing construction on underwater structures within a reservoir or outlet may be required.
The Willow Creek dam is an earthen dam constructed in 1966 that impounds a tributary of the Colorado River. A project was completed to rehabilitate the existing outlet works that included the following tasks:
- Install 20' pipe segment with blind flange.
- Reline existing outlet works with steel pipe and replace 2 existing valves in the dry.
- Add new hydraulically operated gate valve.
- Install trash rack and run hydraulic lines.