Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 14- Dam Safety Performance Monitoring Program: Difference between revisions
From ASDSO Dam Safety Toolbox
(Created page with "{{References Template |author= <!-- Add author/publisher below--> Federal Energy Regulatory Commission |date= <!-- Add publication year --> 2017 |picture= <!--create a file below in format File:example.png, then add picture to that file--> File:Ch14.jpg |link= <!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> https://3.238.206.13/images/3/3d/Ch14.pdf |abstract= <!-- Add document summary--...") |
No edit summary |
||
(One intermediate revision by one other user not shown) | |||
Line 14: | Line 14: | ||
|link= | |link= | ||
<!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> | <!-- Add Url to document below (To retrieve URL from a pdf, add document as a pdf file and copy link address from its page--> | ||
https:// | https://damtoolbox.org/images/3/3d/Ch14.pdf | ||
|abstract= | |abstract= |
Latest revision as of 23:02, 16 December 2022
Federal Energy Regulatory Commission, 2017
The guidelines presented in this chapter provide recommended procedures and criteria to develop a Dam Safety Performance Monitoring Program based upon "failure mode thinking" to assist in reviewing and evaluating the safety and performance of water retaining project works regulated by FERC. The procedure includes:
- Development of a Supporting Technical Information Document (STI);
- A Potential Failure Mode Analysis (PFMA); and
- Development of a Surveillance and Monitoring Plan (SMP)
Revision ID: 5856
Revision Date: 12/16/2022