(Created page with "<!--Example Page --> <div style= "text-align:center;"> <!-- Add message here --> ''Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunces'' </div> ----</br> <!-- Add body paragraphs here --> Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundatio...")
 
No edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 1: Line 1:
<!--Example Page -->
[[Category:Construction Considerations Outlet Works]]
<div style= "text-align:center;">
----
<!-- Add message here -->
''' ''Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunches'' '''
''Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunces''
 
</div>
----</br>
<!-- Add body paragraphs here -->
<!-- Add body paragraphs here -->
Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).
Concrete bedding was used successfully in this [[Montana]] dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).
<gallery mode="slideshow" >
<gallery mode="slideshow" >
<!-- Add image files here -->
<!-- Add image files here -->
Line 19: Line 17:
File:CB9.jpg|Placing the concrete cap over the pipe.
File:CB9.jpg|Placing the concrete cap over the pipe.
File:CB10.jpg|Installed pipe with concrete bedding and cap.
File:CB10.jpg|Installed pipe with concrete bedding and cap.
File:CB11.jpg|Example detail of bedding configuration.
File:CB11.jpg|Example detail of bedding configuration.  


</gallery>
</gallery>


[[File:CB1.jpg]]
 
[[File:CB2.jpg]]
''Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.''
[[File:CB3.jpg]]
[[File:CB4.jpg]]
[[File:CB5.jpg]]
[[File:CB6.jpg]]
[[File:CB7.jpg]]
[[File:CB8.jpg]]
[[File:CB9.jpg]]
[[File:CB10.jpg]]
[[File:CB11.jpg]]
[[Category:Example Pages]]
[[Category:Example Pages]]
{{Revhistinf}}
{{Revhistinf}}

Latest revision as of 21:47, 17 March 2023


Message: Concrete bedding installs relatively quickly, without the need for compaction under pipe haunches

Concrete bedding was used successfully in this Montana dam. Placing and encasing the 170-ft, 48-inch concrete outlet conduit was estimated to cost $133,000 (2013 cost). Six days of work effort were required to construct the foundation of the spillway riser, excavate the outlet conduit trench, and place the outlet conduit (including concrete bedding placement).