ASDSO Dam Safety Toolbox

Center Control: Difference between revisions

From ASDSO Dam Safety Toolbox
Jump to: navigation, search
(Created page with "Dams that control outflow using a slide gate or flashboards in the center of the dam are good for remote locations because they are difficult to misoperate. Typically, dams with center control are small, low head dams. ==Dual Chamber with Spillway Splitter Wall== <gallery mode="slideshow" > <!-- Add image files here --> File:flashboardc.jpg|With flashboard control File:Slidegatec.jpg|With slide gate control </gallery> File:flashboardc.jpg File:Slidegatec.jpg '''...")
 
No edit summary
 
(One intermediate revision by the same user not shown)
Line 7: Line 7:
File:Slidegatec.jpg|With slide gate control
File:Slidegatec.jpg|With slide gate control
</gallery>
</gallery>
[[File:flashboardc.jpg]]
 
[[File:Slidegatec.jpg]]
'''Pros:'''
'''Pros:'''
*Great for remote locations
*Great for remote locations
Line 23: Line 22:


==Dual Chamber with Dual Slide Gates==
==Dual Chamber with Dual Slide Gates==
 
</br>
Dual Chamber with Dual Slide Gate Configuration:
Dual Chamber with Dual Slide Gate Configuration:
[[File:DualChamber.jpg|center|700px]]
[[File:DualChamber.jpg|center|700px]]
Line 39: Line 38:


==Single Chamber and Gate==
==Single Chamber and Gate==
 
</br>
Single Chamber and Gate Configuration:
Single Chamber and Gate Configuration:
[[File:SingleChamber.jpg|center|700px]]
[[File:SingleChamber.jpg|center|700px]]

Latest revision as of 19:43, 24 June 2022

Dams that control outflow using a slide gate or flashboards in the center of the dam are good for remote locations because they are difficult to misoperate. Typically, dams with center control are small, low head dams.

Dual Chamber with Spillway Splitter Wall

Pros:

  • Great for remote locations
  • "Spilled" water is conserved (in delivery system)
  • Less expensive than systems with gate & gate operators
  • Difficult to misoperate

Cons:

  • Cannot make low level releases unless all flashboards are removed
  • Only reasonable for small, low head dams
  • Potential for leakage along internal weir divider or around joints (if precase tower sections are used)

Examples

Dual Chamber with Dual Slide Gates


Dual Chamber with Dual Slide Gate Configuration:

Pros:

  • Easy access to gate for operation
  • Gate stems are protected from ice
  • Guard gate allows work to be done on operating gate or downstream conduit without draining the reservoir

Cons:

  • Venting required

Examples

Single Chamber and Gate


Single Chamber and Gate Configuration:

Pros:

  • Easy access to gate for operation
  • Straightforward hydraulics

Cons:

  • Venting required
  • Spilled water may be lost
  • Need to construct auxiliary earthen spillway - can be expensive, high maintenance

Examples


Revision ID: 1503
Revision Date: 06/24/2022