Engineering Oversight of Construction: Difference between revisions
No edit summary |
No edit summary |
||
(8 intermediate revisions by 4 users not shown) | |||
Line 1: | Line 1: | ||
__NOTOC__ | __NOTOC__ | ||
[[Category: | [[Category:Construction]] | ||
---- | ---- | ||
<!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> | ||
{{Picture | |||
<!-- Add image file name (ex.image.jpg) --> | |||
|image= oversight.png | |||
<!--Add link if applicable --> | |||
|link= | |||
<!-- Add picture caption --> | |||
|caption= Gross Reservoir Expansion Project | |||
(Image Source: Denver Water). | |||
}} | |||
"Quality [[construction]] is critical to dam safety. Construction personnel must be constantly alert to recognize and recommend the possible need for adjustments in the design, construction materials, and construction practices to properly provide for actual conditions encountered. The essential aspects of the construction program include: | "Quality [[construction]] is critical to dam safety. Construction personnel must be constantly alert to recognize and recommend the possible need for adjustments in the design, construction materials, and construction practices to properly provide for actual conditions encountered. The essential aspects of the construction program include: | ||
Line 10: | Line 19: | ||
*"Providing a formal plan for construction inspection to ensure that each facet of essential work is accomplished in multishift operations | *"Providing a formal plan for construction inspection to ensure that each facet of essential work is accomplished in multishift operations | ||
*"Giving the Project Construction Engineer the authority to suspend work until all site conditions different from those anticipated are evaluated and the necessary design or construction changes are implemented | *"Giving the Project Construction Engineer the authority to suspend work until all site conditions different from those anticipated are evaluated and the necessary design or construction changes are implemented | ||
*"Inspection and | *"Inspection and acceptation of critical work stages, by the appropriate engineers or geologist (design and/or technical review personnel) | ||
*"Keeping a job diary and documentation that provides a complete history of the work | *"Keeping a job diary and documentation that provides a complete history of the work | ||
*"Providing mapping and photographic documentation of the construction progress and of significant events; e.g., geologic maps and photographs of final treated foundation." <ref name="Small Dams">[[Design of Small Dams| Design of Small Dams | *"Providing mapping and photographic documentation of the construction progress and of significant events; e.g., geologic maps and photographs of final treated foundation." <ref name="Small Dams">[[Design of Small Dams | Design of Small Dams, USBR, 1987]]</ref> | ||
==Examples== | ==Examples== | ||
{{Website Icon}} [https://damfailures.org/case-study/williamsburg-reservoir-dam-massachusetts-1874/ Learn more about the importance of proper construction oversight from the failure of Williamsburg Reservoir Dam at DamFailures.org] | {{Website Icon}} [https://damfailures.org/case-study/williamsburg-reservoir-dam-massachusetts-1874/ Learn more about the importance of proper construction oversight from the failure of Williamsburg Reservoir Dam at DamFailures.org] | ||
==Best Practices Resources== | |||
{{Document Icon}} [[Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 7- Construction Quality Control Inspection Program | Engineering Guidelines for the Evaluation of Hydropower Projects: Chapter 7- Construction Quality Control Inspection Program, FERC]] | |||
==Trainings== | |||
{{Video Icon}} [[On-Demand Webinar: Dam Construction Quality Control: Dos, Dont's and Lessons Learned]] | |||
{{Video Icon}} [[On-Demand Webinar: Quality Assurance and Field Inspection for Dam Construction Projects]] | |||
{{Video Icon}} [[On-Demand Webinar: Pitfalls in Quality Control Processes for Compacted Earth Fill]] | |||
{{Video Icon}} [[On-Demand Webinar: Fundamentals of Concrete Construction Inspections for Dams and Appurtenant Structures]] | |||
{{Video Icon}} [[On-Demand Webinar: Managing Increased Dam Safety Risk During Reconstruction]] | |||
<!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> | <!-- For information on notation for in text citations visit https://www.mediawiki.org/wiki/Help:Cite Or simply enclose the citation as shown <ref> citation </ref> in the location of the in text mention. Citations will automatically populate below--> |
Latest revision as of 16:13, 21 July 2023
Gross Reservoir Expansion Project
(Image Source: Denver Water). |
"Quality construction is critical to dam safety. Construction personnel must be constantly alert to recognize and recommend the possible need for adjustments in the design, construction materials, and construction practices to properly provide for actual conditions encountered. The essential aspects of the construction program include:
- "Keeping construction engineers and inspectors informed of the design philosophies, assumptions, and intent of the designer with regard to foundation excavation and treatment, to the usage and processing of construction materials, and to the design concepts associated with the construction of embankments and concrete structures and with the installation of mechanical and electrical equipment
- "Keeping construction engineers and inspectors informed of the field control measures and tests required to ensure quality construction
- "Maintaining an adequately staffed and equipped materials laboratory at the dam site to meet the field testing requirements
- "Providing a formal plan for construction inspection to ensure that each facet of essential work is accomplished in multishift operations
- "Giving the Project Construction Engineer the authority to suspend work until all site conditions different from those anticipated are evaluated and the necessary design or construction changes are implemented
- "Inspection and acceptation of critical work stages, by the appropriate engineers or geologist (design and/or technical review personnel)
- "Keeping a job diary and documentation that provides a complete history of the work
- "Providing mapping and photographic documentation of the construction progress and of significant events; e.g., geologic maps and photographs of final treated foundation." [1]
Examples
Best Practices Resources
Trainings
On-Demand Webinar: Dam Construction Quality Control: Dos, Dont's and Lessons Learned
On-Demand Webinar: Quality Assurance and Field Inspection for Dam Construction Projects
On-Demand Webinar: Pitfalls in Quality Control Processes for Compacted Earth Fill
On-Demand Webinar: Managing Increased Dam Safety Risk During Reconstruction
Citations:
Revision ID: 7389
Revision Date: 07/21/2023