Filter Diaphragms: Difference between revisions
From ASDSO Dam Safety Toolbox
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 1: | Line 1: | ||
[[Category:Construction Considerations Outlet Works]] | |||
---- | |||
''' ''Message: Constructing the filter diaphragm is a critical component of a dam's integrity.'' ''' | |||
''Message: Constructing the filter diaphragm is a critical component of a dam's integrity.'' | |||
<!-- Add body paragraphs here --> | <!-- Add body paragraphs here --> | ||
Constructing filter diaphragms using good construction practices is critical to the integrity of a dam. Two common techniques used in filter diaphragm construction include concurrent construction and cut and fill construction | Constructing filter diaphragms using good [[construction]] practices is critical to the integrity of a dam. Two common techniques used in filter diaphragm construction include concurrent construction and cut and fill construction. | ||
A few important items to consider: | |||
On-site soils tend to be gap graded and are prone to segregation. If on-site soils are used in the downstream shell of a dam, carefully place soils to minimize segregation. | *'''Existing Conduits:''' When retrofitting a filter diaphragm around an existing conduit as part of a [[rehabilitation]] project, it may not be possible to get adequate compaction of filter sand under the conduit. In these cases, Reclamation recommends cutting the conduit to allow compaction of the sub-grade prior to re-construction of the conduit (see [[Design Standards No. 13: Embankment Dams (Ch. 5: Protective Filters)]]). | ||
*'''Contamination:''' If there are contaminations in the filter, concentrated flows can develop that can lead to erosion of embankment particles. | |||
*'''Compaction:''' Compaction during construction can further break down particles and lower the permeability of filters. For critical filters and drains, consider specifying material gradations. | |||
*'''Segregation:''' On-site [[soils]] tend to be gap graded and are prone to segregation. If on-site soils are used in the downstream shell of a dam, carefully place soils to minimize segregation. | |||
==Concurrent Construction== | ==Concurrent Construction== | ||
<gallery mode="slideshow" > | <gallery mode="slideshow" > |
Latest revision as of 21:45, 17 March 2023
Message: Constructing the filter diaphragm is a critical component of a dam's integrity.
Constructing filter diaphragms using good construction practices is critical to the integrity of a dam. Two common techniques used in filter diaphragm construction include concurrent construction and cut and fill construction.
A few important items to consider:
- Existing Conduits: When retrofitting a filter diaphragm around an existing conduit as part of a rehabilitation project, it may not be possible to get adequate compaction of filter sand under the conduit. In these cases, Reclamation recommends cutting the conduit to allow compaction of the sub-grade prior to re-construction of the conduit (see Design Standards No. 13: Embankment Dams (Ch. 5: Protective Filters)).
- Contamination: If there are contaminations in the filter, concentrated flows can develop that can lead to erosion of embankment particles.
- Compaction: Compaction during construction can further break down particles and lower the permeability of filters. For critical filters and drains, consider specifying material gradations.
- Segregation: On-site soils tend to be gap graded and are prone to segregation. If on-site soils are used in the downstream shell of a dam, carefully place soils to minimize segregation.
Concurrent Construction