ASDSO Dam Safety Toolbox

File:EM 1110-2-2901 1997.pdf

From ASDSO Dam Safety Toolbox
Jump to: navigation, search

EM_1110-2-2901_1997.pdf(file size: 3.29 MB, MIME type: application/pdf)

Summary

This manual was prepared by CECW-ED and CECW-EG and provides technical criteria and guidance for the planning, design, and construction of tunnels and shafts in rock for civil works projects. Specific areas covered include geological and geotechnical explorations required, constn1ction of tunnels and shafts, design considerations, geomechanical analysis, design of linings, and instrumentation and monitoring.

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeDimensionsUserComment
current14:54, 27 March 2026 (3.29 MB)[email protected] (talk | contribs)This manual was prepared by CECW-ED and CECW-EG and provides technical criteria and guidance for the planning, design, and construction of tunnels and shafts in rock for civil works projects. Specific areas covered include geological and geotechnical explorations required, constn1ction of tunnels and shafts, design considerations, geomechanical analysis, design of linings, and instrumentation and monitoring.

There are no pages that use this file.