Revision as of 23:29, 21 February 2023 by Grichards (talk | contribs) (Created page with "{{References Template |author= <!-- Add author/publisher on blank line below--> Published Jointly by the U.S. Army Corps of Engineers and Bureau of Reclamation |date=<!-- Add publication year on blank line below --> 2019 |picture= <!--upload a file to the site and reference it below in this format File:example.png--> File:USACE-RIDM1.jpg |link= <!-- Add URL to document on blank line below (To retrieve URL for a PDF, upload document as a PDF file and copy link address fr...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Published Jointly by the U.S. Army Corps of Engineers and Bureau of Reclamation, 2019



The Bureau of Reclamation (Reclamation) and the U.S. Army Corps of Engineers (USACE) have been using risk analysis as the primary support for dam safety decision making for over 20 years. Procedures for analyzing risks and understanding of potential failure modes are developing constantly as a result of lessons learned and technological advancements. This Best Practices manual provides guidance for evaluating risks using the current methodology.

Risk analysis at Reclamation and USACE occurs at different levels, ranging from screening level to a fully facilitated team risk analysis. While the tools in this manual apply generally to all levels of risk analysis, more detailed data and analysis are typical for more advanced risk analyses. Practitioners who reference these Best Practices should understand that this manual is intended to provide guidance, but every site is unique, so critical thinking is necessary to characterize risk. For the purposes of risk analysis and risk assessment for dams and levee safety, “RISK” is defined as the product of the likelihood of an adverse outcome and the consequences of that outcome.

The manual is reviewed and updated periodically to stay current with the state of the practice; however, this guidance is not a prescriptive approach. Procedures and data for quantitative dam and levee safety risk analysis do not provide accurate or precise numerical results. Risk analysis teams must balance calculations with judgment to estimate the risks and to build a case for the risk driving influences. The numbers are less important than the identification, understanding, and documentation of the major risk contributors.