Breach Estimation
From ASDSO Dam Safety Toolbox
In performing a risk analysis, the magnitude of the breach opening must be estimated. See also: Breach Parameters.
Citations:
Revision ID: 5068
Revision Date: 12/08/2022
In performing a risk analysis, the magnitude of the breach opening must be estimated. See also: Breach Parameters.
Citations:
Revision ID: 5068
Revision Date: 12/08/2022