ASDSO Dam Safety Toolbox

Headcuts in stream can lead to failure

From ASDSO Dam Safety Toolbox
Revision as of 00:22, 2 December 2022 by Grichards (talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Message: Address headcuts quickly

A headcut formed downstream of this Montana Dam. The outlet was relocated to the opposite side of the dam, away from the original channel. The discharge from the dam was forced to travel down a new channel, most likely causing the headcut. The dam could have been protected using a grade-control structure, which would have stopped the headcut from progressing.


Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 4691
Revision Date: 12/02/2022