ASDSO Dam Safety Toolbox

File:GroutingOperations RidgesBasinDam.png

From ASDSO Dam Safety Toolbox
Revision as of 17:07, 3 November 2022 by Rmanwaring (talk | contribs) ((USBR DS13-15) Design Standards No. 13: Embankment Dams (Chapter 15 Foundation Grouting) Figure 15.1.2-1 Overview of grouting operations at Ridges Basin Dam (2014).)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

GroutingOperations_RidgesBasinDam.png(674 × 506 pixels, file size: 809 KB, MIME type: image/png)

Summary

(USBR DS13-15) Design Standards No. 13: Embankment Dams (Chapter 15 Foundation Grouting) Figure 15.1.2-1 Overview of grouting operations at Ridges Basin Dam (2014).

File history

Click on a date/time to view the file as it appeared at that time.

Date/TimeThumbnailDimensionsUserComment
current17:07, 3 November 2022Thumbnail for version as of 17:07, 3 November 2022674 × 506 (809 KB)Rmanwaring (talk | contribs)(USBR DS13-15) Design Standards No. 13: Embankment Dams (Chapter 15 Foundation Grouting) Figure 15.1.2-1 Overview of grouting operations at Ridges Basin Dam (2014).

The following page uses this file:

Metadata