HDPE Encased in Concrete
From ASDSO Dam Safety Toolbox
Message: HDPE pipe should be encased in concrete.
The CMP outlet in this Washington State Dam was replaced with HDPE pipe. The pipe was encased in concrete to ensure quality compaction against the conduit.
Note: The content on this page was originally created as part of DamOutletWorks.org (DOWL, 2018). It has subsequently been updated and reformatted as part of the Dam Safety Toolbox.
Revision ID: 3177
Revision Date: 09/15/2022