ASDSO Dam Safety Toolbox

O&M of a Reservoir

From ASDSO Dam Safety Toolbox
Revision as of 23:18, 7 September 2022 by Rmanwaring (talk | contribs) (Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> Deposition of sediments in the reservoir is problematic as it reduces the reservoir’s potential storage capacity. These accumulated sediments can be removed in a variety of ways including sluicing through the bottom outlet of the dam (if one exists) and dredging. “Existing reservoirs are routinely surveyed to determine sediment deposition and resulting...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Deposition of sediments in the reservoir is problematic as it reduces the reservoir’s potential storage capacity. These accumulated sediments can be removed in a variety of ways including sluicing through the bottom outlet of the dam (if one exists) and dredging.

“Existing reservoirs are routinely surveyed to determine sediment deposition and resulting loss of storage”.[1]

Examples

Best Practices Resources

EM 1110-2-1420 Hydrologic Engineering Requirements for Reservoirs

Trainings


Citations:


Revision ID: 2447
Revision Date: 09/07/2022