ASDSO Dam Safety Toolbox

All public logs

Jump to: navigation, search

Combined display of all available logs of ASDSO Dam Safety Toolbox. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).

Logs
  • 17:15, 7 September 2022 Rmanwaring talk contribs created page Spillway Conveyance (Created page with "__NOTOC__ ---- <!-- Delete any sections that are not necessary to your topic. Add pictures/sections as needed --> “Conveyance features located immediately upstream and downstream of a control structure include approach channels, inlet structures, chutes, conduits, and/or tunnels. These conveyance features pass flow from the reservoir to the control structure, as well as pass flow from the control structure to the terminal structure. The conveyance feature (such as an a...")