All public logs
Combined display of all available logs of ASDSO Dam Safety Toolbox. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
- 19:40, 6 September 2022 Cort talk contribs created page Borrow Investigation (Created page with "__NOTOC__ ---- Earthen embankment dams are most cost effective if the material is extracted from the proposed reservoir location. Not only are transportation costs of the material minimized, but the material volume can then be added to the total eventual water storage of the reservoir once filled. Additionally, sourcing the borrow material from within the proposed reservoir reduces the impact of excavation and extraction of native soils from locations that will not be in...")